Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.6
Permit Number - TC-COM-1223-02823
Review Name: COMMERCIAL REVIEW - FULL v.6
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/02/2024 | Commercial Structural | APPROVED | |||
05/02/2024 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
05/01/2024 | Site Engineering | REQUIRES RESUBMIT | See zoning comment | ||
04/30/2024 | Site Zoning | REQUIRES RESUBMIT | FROM: PDSD Zoning Review Section PROJECT: TC-COM-1223-02823 TC-COM-1223-02823. – PAD-12 Shade sail over playground (3rd Review) TRANSMITTAL DATE: April 30, 2024 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This site is located in PAD-12 zone (UDC 4.7.24). 1. This Comment Was Not Addressed. The DP is a separate permit submittal from the building plans, and cannot be submitted as an additional document to this permit. Per UDC Article 3.3.3.G.2.c A site plan (Development Package) is required for the following types of development: Existing development undergoing a change of use, building structure additions, and/or a reconfiguration of an area outside a building. A development package (DP) meeting the requirements of the Checklist for Minor Changes to Commercial/Industrial Sites is required to be submitted and approved. The checklist can be found at: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/minor_changes_to_commercial_industrial_sites_.pdf. If you have any questions about this transmittal, please contact Nathan Herrera at Nathan.Herrera@tucsonaz.gov. |
||
04/01/2024 | PDSD Application Completeness | REVIEW COMPLETED |