Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1223-02789
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/09/2024 | Water - PDSD | APPROVED | |||
| 01/09/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 12/26/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Madeline Nelson mnelson@safebuilt.com Approved Reason: Date Completed : 12/20/2023 10:40:13 AM Building(B) Reviewer Andrew Bevis abevis@safebuilt.com Approved Reason: Date Completed : 12/18/2023 5:20:32 PM Mechanical(M) Reviewer Jorge Valido jvalido@safebuilt.com Denied Reason: Date Completed : 12/18/2023 8:41:55 PM 1. General - Provide Manufacturer Hood Plans - 2018 International Mechanical Code section 507.1 - 2018 International Energy Conservation Code Section C103.2 Information on construction documents (4) 2. General - Provide Manufacturer Fire Suppression Plans - 2018 International Mechanical Code Section 509.1 - 2018 International Energy Conservation Code Section C103.2Information on construction documents (4) 3. General - Provide Roof Plan. Show on roof plan all distances from edge of building to HVAC equipment and Hood supply and exhaust equipment. If applicable provide Guards for all equipment - 2018 International Mechanical Code Section [BE] 304.11. Electrical(E) Reviewer Ron Ross rross@safebuilt.com Approved with Comments Reason: Date Completed : 12/14/2023 12:57:29 PM Electrical Review of Meteor Café By: Ron Ross PE E2.0 POWER PLAN: Some numbers do not correlate to the panel schedule descriptions. Would suggest to relocate electrical panels from utility room between Janitor’s sink and Water Heater. Suggestion only, as design is code compliant, but may receive negative feedback from a local field inspector. Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Denied Reason: Date Completed : 12/25/2023 4:10:29 PM First Plumbing Review: 1). Hydro mechanical grease interceptor on plan page G250 on plan page P1 can only receive discharge from 4 fixtures & Zero dishwashers per Tucson Plumbing Code Amendments. 2). Water connection to Number 53 beer dispenser on plan page P5 needs backflow protection, -IPC 608.17 3). Add Gas sizing table used & system legnth to plan page P3 -IFGC 402.3 4). Grease interceptor on plan page P1 needs to be vented. -IPC 1003.9 |
||
| 12/27/2023 | Fire New Construction | REQUIRES RESUBMIT | -Provide code analysis on drawings. john.vincent@tucsonaz.gov 5203495581 |
||
| 01/04/2024 | Site Engineering | REQUIRES RESUBMIT | See zoning comment | ||
| 12/20/2023 | Site Zoning | REQUIRES RESUBMIT | ZONING REVIEW TRANSMITTAL FROM: Wyatt Berger Lead Planner PROJECT: TC-COM-1223-02789 901 West Congress Street – C-1 The Meteor Cafe (1st Review) TRANSMITTAL DATE: December 20, 2023 Please resubmit revised drawings with a detailed response letter stating how all Zoning Review Section comments were addressed. 1. Zoning has reviewed the building plans for compliance with the associated development package TD-DEV-1022-00004. Although it appears the building plan footprint, building height, and square footage are consistent with the submitted development package, Zoning cannot approve TC-COM-1223-02789 until the associated development package is approved. If you have any questions about this transmittal, contact me at Wyatt.Berger@tucsonaz.gov or at 520-837-4951. |
||
| 12/07/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |