Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-1223-02775
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
01/09/2024 Bldg Permits - Post Review Express PENDING ASSIGNMENT
01/04/2024 Site Engineering REQUIRES RESUBMIT See zoning comment
12/14/2023 Site Zoning REQUIRES RESUBMIT FROM: PDSD Zoning Review Section

PROJECT: TC-COM-1223-02775 - TD-DEV-1123-00456
2550 W IRONWOOD HILL DR. (R-3)
Multifamily – Converting 4 BR units to 2 & 1 BR Units (1st Review)

TRANSMITTAL DATE:‎ December 14, 2023

COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This site is located in the R-3 zone (UDC 4.7.12). Mulitfamily is a permitted use in this zone (Table 4.8-2), Use Specific Standard 4.9.7.B.6.

1. As Development Package (DP), TD-DEV-1123-00456, has not completed it’s first review Zoning cannot review for compliance and will review on the next submittal. Until the DP is approved by all review agencies Zoning cannot approve the building plans.


If you have any questions about this transmittal, please contact If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov.
01/09/2024 Water - PDSD REQUIRES RESUBMIT 1. Provide the size of the water meter serving this building, the size of the backflow preventer (if any) associated with the water meter, and the total water demand served by the water meter. Reference: Section 107.2.1, IBC 2018.
2. Clarify the size of the water service pipe serving this building. It is noted as both 2-1/2 inch and 2 inch.
12/11/2023 External Reviewers - SAFEBuilt REVIEW COMPLETED Structural(S) Reviewer
Kimiyoshi Shimabukuro
kshimabukuro@safebuilt.com
Approved
Reason:
Date Completed : 12/8/2023 8:26:12 PM



Building(B) Reviewer
Kimiyoshi Shimabukuro
kshimabukuro@safebuilt.com
Approved
Reason:
Date Completed : 12/8/2023 8:27:05 PM



Mechanical(M) Reviewer
Kimiyoshi Shimabukuro
kshimabukuro@safebuilt.com
Approved
Reason:
Date Completed : 12/8/2023 8:26:28 PM



Electrical(E) Reviewer
Kimiyoshi Shimabukuro
kshimabukuro@safebuilt.com
Approved
Reason:
Date Completed : 12/8/2023 8:26:36 PM



Plumbing(P) Reviewer
Kimiyoshi Shimabukuro
kshimabukuro@safebuilt.com
Approved
Reason:
Date Completed : 12/8/2023 8:26:19 PM
12/27/2023 Fire New Construction REVIEW COMPLETED
12/07/2023 PDSD Application Completeness Express REVIEW COMPLETED