Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1223-02773
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 12/14/2023 | Site Zoning | APPROVED | |||
| 01/09/2024 | Water - PDSD | APPROVED | |||
| 01/04/2024 | Site Engineering | NOT REQUIRED | |||
| 01/09/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 12/18/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Andrew Bevis abevis@safebuilt.com Approved Reason: Date Completed : 12/18/2023 1:06:35 PM Building(B) Reviewer Andrew Bevis abevis@safebuilt.com Denied Reason: Date Completed : 12/18/2023 12:33:11 PM 1. Sheet T1.0: The applicable codes table does not include the correct editions that are adopted and enforced by the City of Tucson. Provide the corrected editions for adopted and enforced. 2. Sheet T1.0: The applicable codes under the code review table is incorrect. The IRC would not apply to a commercial project. Provide the correct applicable codes for this project. 3. Sheet T1.0: The occupant load calculations are incorrect. There are several rooms where the use is not clear. There is a distinct difference between occupancy classification and occupancy use. The exceptions provided in Section 303.1.2 apply to that of classification and the requirements of max. allowable area, height, stories, mix-use requirements and overall classification of the building. So yes, this room is considered as business in the overall context of the structure and can comply with the business requirements previously mentioned. However, when calculating occupant loads, one must calculate based on the use of the space. The waiting room's use is assembly and the occupant load must be calculated as such in accordance with Section 1004 and Table 1004.5. Provide a space by space occupant load calculations in accordance with 2018 IBC Table 1004.5 and Section 1004.3. 4. Sheet T1.0: The use of the STG room is not clear. Provide a clear narrative as to the use of the STG room. 5. Sheet A4.0: The reflected ceiling plan does not indicate the location of exit lighting. Provide the location of all exit lighting in accordance with 2018 IBC Section 1013. 6. Sheet A4.0: The reflected ceiling plan does not indicate the location of egress lighting. Provide the location of all egress lighting in accordance with 2018 IBC Section 1008. Mechanical(M) Reviewer Andrew Bevis abevis@safebuilt.com Denied Reason: Date Completed : 12/18/2023 1:00:06 PM 1. Sheet M1.0: Provide mechanical data for the scope of this project, including but not limited to equipment schedules, basic mechanical notes, details (i.e. section through AHU, exhaust fan through roof, condensing unit at roof, curb support for equipment, etc…), and other information pertinent to the work. 2. Sheet M1.0: Prepare mechanical calculations to show that outside air and other ventilation requirements are met and balanced. Include a ventilation schedule to drawings. Reference 2018 IMC Section 403.1 and Table 403.3. 3. Sheet M1.0: Please provide a COMcheck that indicates compliance for new mechanical system and scan that data onto one of the mechanical sheets. This provides evidence the mechanical system is in compliance. Electrical(E) Reviewer Andrew Bevis abevis@safebuilt.com Denied Reason: Date Completed : 12/18/2023 1:06:21 PM 1. Sheet E1.0: Please provide a prescriptive path or provide COMcheck calculations for the lighting. All mandatory requirements must be identified on the plans for compliance. Plumbing(P) Reviewer Andrew Bevis abevis@safebuilt.com Denied Reason: Date Completed : 12/18/2023 1:04:00 PM 1. Sheet P1.0: The construction plans shall include for each floor level a riser diagram of the plumbing water, gas, and waste piping work. The construction plans shall indicate the direction of flow, all pipe sizes, grade of horizontal piping, loading, and location of fixtures and appliances. Please provide a rise diagram for each plumbing system, including gas piping if part of the project. Reference 2018 IPC Section 316.1.4. 2. Sheet P1.0: The location of water heater must be provided on the floor plan. If the water heater is suspended above the floor, provide a detail for the structural support, pressure relief valve discharge, cold water and hot water piping along with the shutoff valves, expansion tank, etc. Revise plans to reflect this information. Reference 2018 IPC Section 502. |
||
| 12/11/2023 | Fire New Construction | REVIEW COMPLETED | |||
| 12/07/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |