Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1222-00367
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/10/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
01/10/2023 | Commercial Electrical | REQUIRES RESUBMIT | 1 Verify that the existing Meter can is listed for use as a electrical Junction Box and provide evidence that the enclosure meets the requirements of NEC art 110.3, 314.28. 2 Provide complete electrical floor plans showing the locations and branch circuit designations for all the equipment shown in the Panel Schedule for the New Panel âKâ, or provide a note stating the that the equipment shown in the Panel Schedule for âKâ is installed per separate permit. Ref; 2018 IBC section 107.2.1, 2017 NEC, City of Tucson Commercial Plan Submittal Requirements. |
||
01/06/2023 | PDSD Application Completeness | REVIEW COMPLETED |