Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TC-COM-1222-00285
Parcel: 12405049A

Review Status: Approved

Review Details: COMMERCIAL REVIEW - FULL v.2

Permit Number - TC-COM-1222-00285
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Approved
Review Date Reviewer's Name Type of Review Description Status Comments
02/17/2023 Design Review APPROVED DATE: February 16, 2023
FROM: Rick Gonzalez, Architect (#26992)
COT On-Call Design Professional
RE: CD Review, Illegal Pete's,
MGD-15-01, HPZ-22-068, TC-COM-122-00285
I have reviewed the Illegal Pete's Construction Documents submitted on January
1 of 2023 for the purpose of determining conformance with the Design Package
of the IID. I have checked the submittal against the Main Gate District (MGD)
Ordinance Requirements relative to Section C-19, Design Standards under
procedure described in Section B-2.d.
Submittal Requirements Status
1. Lighting: Conforms
minimize light glare and trespass, conserve energy,
promote safety and security, full cut-off fixtures,
concealed from public right-of-way view
2. Building Materials and Colors: Colors not shown on CDs, but OK as long as colors conform to approved Design Package.
chosen for tactile effects, contrast... like rough to
smooth, vertical patterns vs. horizontal. Etc., integral
colors, visual and physical permanence in the Sonoran
Desert. Localizing effect, ambiance, coherence with the
neighborhood. Facades on public streets or open space:
Use high quality materials such as: brick, stone, pre-cast
concrete, cast stone, CMU's. Brick panels... Architectural
metals... panels, sheets... with expressed seams, cuts,
stamps, casts, or ornamental panels. Glass/glass block...
Modular panels: EIFS, stucco, but less than 25% of total
facade at the base along public streets. At lower floors
adjacent to street frontage, respond to pedestrian ways...
using quality scale, texture color, detail. Material
combinations reinforce architectural scaling requirements.
Reflects tradition of U of A, COT, adjacent historic
neighborhoods. Use accent colors consistently throughout:
signs, architectural features, lighting, window/door frames,
and accent walls. Avoid glare reflective producing
materials.
3. Architectural Elements and Features: CDs Conform to
Balconies, outdoor stairs, ornaments and surface details the approved
such as screening, cladding and fenestration shall be Design Package
provided to enhance the architectural style of the
building. No balconies allowed in group dwellings.
Consider appropriate use, scale, proportion, texture
Carefully integrate in the concept design. Clear visual
distinction between the ground and upper floors.
Arcades, when used, place along south and west facades,
unless along Park Avenue. Construct out of wood, brick,
canvas, metal, stone or concrete. Street facing facades:
20' maximum single plane without architectural detailing.
Outdoor vending and gathering areas encouraged.
Delineate with hardscape, grade change, or vegetation.
4. Building Articulation:
3 consecutive street facing facade areas: same paint N/A to Modification
or method of articulation. Articulate facades at entries
between retail spaces for patio and outside engagement.
Building long than 85' – articulate each 85' to appear as
separate buildings along a front property line. Building
corners – add articulation to emphasize and promote
gathering (e.g. roof/facade higher at corner).
Local public art encouraged (e.g. sculpture art).
5. Doors N/A
shade and weather protection at entries, clear
identification, safe, secure, universally accessible.
Storefronts – provide awnings, canopies for shade,
color, and material variation; integrate with sidewalk
design and treatment. Clearly identifiable “front door”
at each facade on a major street. Residential Units -
provide separate street access, residential scale,
demarcated by awning, stoop or recess.
6. Windows and Glazing: N/A
low e, visual connection through either side. Size,
proportion, pattern relates to unit type/layout.
Reinforces facade patterns of scale and variety.
property and the proposed use(s). Mixed usesuses
a variety of ratios of clear to opaque surfaces
(i.e. glass to wall) and on commercial greater glass
to wall.
7. Building Facades: CDs Conform to
Base to have at least two of the following... the approved
trellis or vertical garden with 50% vegetation. Design Package.
Local artist Artwork (e,g, public mural, custom
panel, small retail space (50 sf plus GFA, coffee
cart, kiosk, etc.). Outdoor dining, gathering patio,
delineated by low wall, fence, planter, change of
elevation, or other buffers. Distinctive Lighting.
Shade structure, changes of plane such as indentations,
textures, or accent materials. Windows – 75% minimum
visible light on each side of window. Window displays
or visible activity on ground floor.
8. Streetscape: N/A
along Speedway and Euclid Avenue, design to
promote community.
General Comments:
Based on review of the CDs, I recommend Approval.
Sincerely,
Rick Gonzalez, Architect
RGA
03/02/2023 External Reviewers - Stantec APPROVED
02/15/2023 Historic APPROVED
02/02/2023 Site Engineering APPROVED
03/03/2023 Site Engineering APPROVED Restamp Required
02/21/2023 Site Zoning APPROVED FROM: Paul Camarena
PDSD Zoning Review Section

PROJECT: TC-COM-1222-00285
876 E UNIVERSITY BL Zoning UHC-1

TRANSMITTAL DATE:‎February 8, 2023


COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

1.COMMENT: .COMMENT: Zoning has reviewed the building plan for compliance with DP22-0175 and although it appears that the building plans match the DP Zoning cannot approve the building plans until the Historic review and the design professional review have been approved.




If you have any questions about this transmittal, Contact Paul Camarena at (520)837-4986 or by email Paul.Camarena@tucsonaz.gov
03/06/2023 Site Zoning APPROVED Restamp Required
03/06/2023 Bldg Permits - Post Review REVIEW COMPLETED
01/24/2023 Fire New Construction REVIEW COMPLETED
03/06/2023 Fire New Construction REVIEW COMPLETED
01/18/2023 PDSD Application Completeness REVIEW COMPLETED