Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1222-00264
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/20/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
01/20/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Activity Number: TC-COM-1222-00264 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: DENIED 1. Provide Geotechnical Report for the proposed building per International Building Code 2018, Section 1803.1. 2. The railing guards are to be designed for the loads provided in IBC 2018 Section 1607.8.1. 3. Structural steel, components and fasteners that are exposed are to be protected against corrosion in accordance with AISC 360 Section B.13 as indicated in IBC 2018 Section 2203.1. 4. Designer is to coordinate venting and drainage hole requirements for HSS tube members that are galvanized using the hot-dip galvanizing process. Provide for plugs as needed. AWS D-19.0 calls for welds on galvanized steel to be free of zinc. Field welds on galvanized parts requires the removal of the zinc coating in the area of weld. Provide zinc paint (approved by the galvanizer) and apply as required to the weld and steel area to provide protection. 1. Provide galvanized bolts on the galvanized framing connections. Submit a response letter addressing these correction items and provide bubbles on the revisions to the drawings. BUILDING REVIEW COMMENTS: DENIED 1. General: The proposed Classroom and Virtual Training Room are placed onsite within close proximity to an existing building. It is not obvious how the fire separation is being addressed. (2018 IBC Table 602) If these buildings are being treated as one building, as allowed for by 2018 IBC Sec. 705.3 Exception #1. Please revise to provide allowable area calculations supporting the concept of one large building onsite. (2018 IBC Sec. 506.2) 2. Sheet A-403 / Detail 8/A-403: Revise to indicate that the leading 2” (two inches) of the tread shall have a visually contrasting color, per ICC/ANSI A117.1-2009 Sec. 504.5.1. MECHANICAL REVIEW COMMENTS: CONDITIONALLY APPROVED Approved/subject to field approval ELECTRICAL REVIEW COMMENTS CONDITIONALLY APPROVED E-601 ELECTRICAL SINGLE LINE DIAGRAM AND SCHEDULES: Should call out NEMA 3R rating on Panel schedule for new exterior panels PLUMBING REVIEW COMMENTS: DENIED First Plumbing Review: 1). Plan Page A-113 needs to include roof drainage sizing calculations. -IPC 1106.1, 1106.3 2). Plan page A-113 needs secondary scuppers. -IPC 1108 3). Plan pages A-115 & A-116 needs to show gutter & downspout sizes with calculations. -IPC 1106.3, 1106.6 4). Hose Bibbs on plan pages P-111 & P-401 need shut off valves --IPC 606.2 5). Main water on plan pages P-111 & P-401 need a main shut off valve location illustrated - IPC 606.1 6). Specification manual & and or plumbing pages do not show the piping materials for the gas system interior & exterior. - IFGC 403.1 If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
||
01/13/2023 | Site Engineering | REQUIRES RESUBMIT | See Zoning Comment | ||
01/04/2023 | Site Zoning | REQUIRES RESUBMIT | FROM: Paul Camarena PDSD Zoning Review Section PROJECT: TC-COM-1222-00264 10001 S WILMOT RD Zoning RH TRANSMITTAL DATE:January 4, 2023 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1.COMMENT: Zoning has reviewed the building plan for compliance with unapproved TD-DEV-1222-00073 and although it appears that the building plans match the DP Zoning cannot approve the building plans until the DP is approved. If you have any questions about this transmittal, Contact Paul Camarena at (520)837-4986 or by email Paul.Camarena@tucsonaz.gov |
||
12/30/2022 | Fire New Construction | REVIEW COMPLETED | |||
12/16/2022 | PDSD Application Completeness | REVIEW COMPLETED |