Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1222-00242
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/13/2023 | Commercial Building | APPROVED | |||
01/04/2023 | Site Zoning | APPROVED | |||
01/09/2023 | Site Engineering | NOT REQUIRED | |||
02/13/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
02/13/2023 | Commercial Electrical | REQUIRES RESUBMIT | REF; Plan sheet E4.0. The Elevation view shows the Service Equipment rated at 400 amps. The load calculations for the Service indicate a load of 528 amps. The Line Diagram shows the Service Equipment Bus rated at 600 amps and the Main Disconnect Switch rated at 800 amps. Please revise the drawings to reflect the correct ratings of the Service components per manufacturers listing and NEMA Standards. NEC 110.3. The 2017 NEC requires all 120 volt branch circuits listed in 210.12A to be protected by Combination Type Arc Fault circuit interrupters. Revise the panel schedule to reflect this. Ref; 2018 IBC section 107.2.1, 2017 NEC. |
||
01/10/2023 | Fire New Construction | REVIEW COMPLETED | |||
12/16/2022 | PDSD Application Completeness | REVIEW COMPLETED |