Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1222-00232
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/13/2022 | Site Zoning | APPROVED | |||
01/04/2023 | Site Engineering | NOT REQUIRED | |||
01/20/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
01/20/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Activity Number: TC-COM-1222-00232 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: CONDITIONALLY APPROVED NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances. BUILDING REVIEW COMMENTS: APPROVED Approved per the following: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel, or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The registered design professional is responsible for following ALL applicable Federal, State, and local Municipal Codes and Ordinances. MECHANICAL REVIEW COMMENTS: CONDITIONALLY APPROVED Approved/subject to field approval ELECTRICAL REVIEW COMMENTS APPROVED PLUMBING REVIEW COMMENTS: DENIED First Plumbing Review: 1). Floral Prep sink on plan page P1.1 needs hot water--IPC 607.1 2). Condensate from AHU1 (1.5 Ton) on plan page P1.1 can't discharge to a floor sink connected to the grease system. - IPC 1003.2 If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
||
01/09/2023 | Fire New Construction | REVIEW COMPLETED | |||
12/12/2022 | PDSD Application Completeness | REVIEW COMPLETED |