Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-1125-02146
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/18/2026 | Site Zoning Standard | APPROVED | |||
| 04/24/2026 | Site Engineering Standard | NOT REQUIRED | |||
| 05/18/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 05/05/2026 | Commercial Electrical Standard | REQUIRES RESUBMIT | Commercial Electrical Review TC-COM-1125-02146 (6102 E 22ND ST TUCSON, AZ 85711) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2024 International Building Code (IBC), 2023 National Electrical Code (NEC), 2012 Outdoor Lighting Code (OLC). https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/building-code/2012_outdoor_lighting_code_.pdf Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov 1. Provide the manufacturer’s installation instructions for the batteries showing that this configuration is allowed. Clarify why the second battery port on the inverter is not being used. 2. Conductor D, between the inverter and the battery combiner bus bars, is undersized for the combined load provided by the two batteries tied together. Or clarify if the PCS is connected to the batteries and limits current from the two batteries. |
||
| 05/18/2026 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 04/24/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |