Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1125-02124
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 12/17/2025 | Commercial Building Standard | APPROVED | |||
| 12/12/2025 | Site Zoning Standard | APPROVED | |||
| 12/16/2025 | Water - PDSD Standard | APPROVED | |||
| 11/26/2025 | Outdoor Lighting Standard | NOT REQUIRED | No modifications to the outdoor lighting. | ||
| 11/26/2025 | Site Engineering Standard | NOT REQUIRED | |||
| 12/17/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 12/08/2025 | Commercial Electrical Standard | REQUIRES RESUBMIT | Commercial Electrical Review TC-COM-1125-02124 (1010 N FINANCE CENTER DR Unit:UNIT 200 TUCSON, AZ 85710) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC). 1. A signature and date are required as part of the Registrant Seal (Electrical). Section R4-30-304 of the Rules of the Arizona State Board of Technical Registration, states that in addition to signing the seal, the registrant shall include the date the document was signed. The EOR seal is missing the date signed. Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov |
||
| 12/16/2025 | Commercial Plumbing Standard | REQUIRES RESUBMIT | 1. Provide tempered water for the restroom lavatories using approved devices conforming to ASSE 1070. Reference: Sections 419.5 and 607.1.2, IPC 2018. 2. Set the metering lavatory faucets to dispense a maximum of 0.25 gallons per metering cycle. Verify that the faucet cycle will last for at least 10 seconds. Reference: Section 419.6, IPC 2018, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09. 3. Verify that the distance from the hot water source (i.e. the recirculating hot water loop) to the hot water termination for the public lavatories complies with the requirements of Section C404.5, IECC 2018 (e.g. 24” for ½” pipe, 6” for ¾” pipe). |
||
| 12/15/2025 | Fire New Construction Standard | REQUIRES RESUBMIT | 1. Indicate if the building has an existing fire alarm that will be modified or if a new fire alarm system will be installed throughout the building. Make these notes on the cover sheet or in the code analysis. Fire alarm is required, 2024 IFC 907.2.2 #2. john.vincent@tucsonaz.gov 5203495581 |
||
| 12/16/2025 | Commercial Mechanical Standard | REVIEW COMPLETED | |||
| 11/24/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |