Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: In Review
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1125-02112
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: In Review
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/21/2025 | Site Engineering Standard | NOT REQUIRED | |||
| N/A | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| N/A | Commercial Building Standard | PENDING ASSIGNMENT | |||
| N/A | Commercial Mechanical Standard | PENDING ASSIGNMENT | |||
| N/A | Commercial Plumbing Standard | PENDING ASSIGNMENT | |||
| N/A | Fire New Construction Standard | PENDING ASSIGNMENT | |||
| N/A | Site Zoning Standard | PENDING ASSIGNMENT | |||
| N/A | Water - PDSD Standard | PENDING ASSIGNMENT | |||
| 12/02/2025 | Commercial Electrical Standard | REQUIRES RESUBMIT | Commercial Electrical Review TC-COM-1125-02112 (1708 W AJO WY TUCSON, AZ 85713) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC). 1. Provide a complete electrical plan-set showing all proposed electrical work and repairs for the affected area. 2. Should include but not be limited to (based on the scope of electrical repairs): a. Provide a panel schedule highlighting the circuits that are being modified and added. Correlate the panel schedule circuit numbers with the location of the electrical outlets, receptacles, switches, mechanical equipment, etc, on the electrical plan. b. Show all wiring methods in detail for all branch circuit wiring along with branch circuit and breaker panel designations and correlate with the panel schedules. NEC arts;300 and 408.4. Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov |
||
| 12/02/2025 | Outdoor Lighting Standard | REQUIRES RESUBMIT | Note on the plans if any outdoor lighting has been damage, repaired or modified. | ||
| 11/20/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |