Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.3
Permit Number - TC-COM-1125-02094
Review Name: COMMERCIAL REVIEW - FULL v.3
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/16/2026 | Commercial Building Standard | APPROVED | |||
| 04/16/2026 | Commercial Mechanical Standard | APPROVED | |||
| 04/16/2026 | Water - PDSD Standard | APPROVED | |||
| 04/16/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 04/16/2026 | Commercial Plumbing Standard | REQUIRES RESUBMIT | ACTIVITY NO. TC-COM-1125-02094 ADDRESS/PARCEL: 2320 N SILVERBELL RD Unit:UNIT 110 TUCSON, AZ 85745 Submit your revised drawings along with a detailed response letter, which states how all comments were addressed. Review will not proceed without the response letter. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. If you have any questions about these review comments, I can be reached at Sean.Severson@tucsonaz.gov COMMENTS: 1. The plans indicate that indirect waste from the grease trap is being routed to the floor sink with an air gap. Per Section 1003.3.8, discharge piping from a grease interceptor shall be directly connected to the sanitary drainage system. Please revise the plans accordingly. Reference: Section 1003.3.8, IPC 2024. 2. If the 3-compartment sink is used only for washing, rinsing, and sanitizing utensils used for food service, the sink shall drain indirectly to the grease interceptor with an air gap or an air break. If, however, the 3-compartment sink is also used for the preparation of food items, separate indirect waste pipes shall be provided for each compartment to protect against cross-contamination or fouling and each indirect drain shall terminate with an air gap. Reference: Sections 801.2, 802.1.1, and 802.1.7, IPC 2024. 3. The Oven (O-1) is missing from Sheet P-1 but is specified on sheet P-2 under the gas load calculations table. Is the oven no longer being installed? |
||
| 04/16/2026 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 04/15/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |