Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TC-COM-1125-02080
Parcel: 119045870

Address:
402 W AJO WY

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.5

Permit Number - TC-COM-1125-02080
Review Name: COMMERCIAL REVIEW - FULL v.5
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
10/27/2026 Bldg Permits - Post Review Express PENDING ASSIGNMENT
10/27/2026 Commercial Mechanical Standard REQUIRES RESUBMIT 1. The heating/cooling load calculations have been provided but the heating/cooling capacity of the split system is not shown. [Initial comment: Provide heating and cooling load calculations to justify the heating/cooling capacities of the proposed HVAC units. Reference: Section C403.1.1 and C502.2.3, IECC 2024 and Section 312.1, IMC 2024.]
2. The heating/cooling load calculations do not show the exhaust flowrate of the restroom exhaust fan and the sequence of operation is also not shown. [Initial comment: Provide the exhaust flowrate for the restroom exhaust and the sequence of operation for the exhaust fan (i.e., continuous or intermittent fan operation). Reference: Section 403.3.1.1, IMC 2024.]

If you have any questions about this review comment, I can be reached at Robert.Sherry@tucsonaz.gov.
10/27/2026 Commercial Plumbing Standard REQUIRES RESUBMIT Comment not resolved. To supply tepid water to a lavatory, a point-of-use instant water heater must be listed to ASSE 1084. [Initial comment: Show how tepid water is being supplied to the lavatory. Reference: Section 607.1, IPC 2024.]
If you have any questions about this review comment, I can be reached at Robert.Sherry@tucsonaz.gov
10/21/2026 PDSD Application Completeness Express REVIEW COMPLETED