Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.4
Permit Number - TC-COM-1125-02080
Review Name: COMMERCIAL REVIEW - FULL v.4
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/05/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 10/05/2026 | Commercial Mechanical Standard | REQUIRES RESUBMIT | 1. The occupancy group for this building has been identified as Mercantile, specifically a smoke shop. Mechanical ventilation will be required if smoking will be allowed in the building. Reference: Section 403.3.1.1, IMC 2024. 2. Provide heating and cooling load calculations to justify the heating/cooling capacities of the proposed HVAC units. Reference: Section C403.1.1 and C502.2.3, IECC 2024 and Section 312.1, IMC 2024. 3. Condensate drains may not terminate in an area that is not capable of absorbing the condensate flow without surface drainage. Reference: Section 307.2.1, IMC 2024, as amended by the City of Tucson 4. Provide the exhaust flowrate for the restroom exhaust and the sequence of operation for the exhaust fan (i.e., continuous or intermittent fan operation). Reference: Section 403.3.1.1, IMC 2024. 5. Why does the electrical panel show two AC units but only one condensing unit is shown on the plans? Power for the mini split fan coils normally is supplied from the condensing unit. Reference: Section 107.2.1, IBC 2024. If you have any questions about this review comment, I can be reached at Robert.Sherry@tucsonaz.gov. |
||
| 10/05/2026 | Commercial Plumbing Standard | REQUIRES RESUBMIT | 1. Reduced pressure backflow prevention assemblies are required at the water meter for multi-use commercial buildings. Verify that Tucson Water does not require the installation of a reduced pressure backflow preventor for this address. Reference: Section 107.2.1, IBC 2024 and Chapter XXVII, Article V, Section 27-72, the Tucson Code, https://www.tucsonaz.gov/files/sharedassets/public/city-services/tucson-water/water-quality/documents/backflow-ordinance.pdf 2. Specify that all proposed plumbing fixtures shall be listed by a third-party certification agency as complying with the relevant standards. Reference: Section 303.4, IPC 2024. 3. Show how tepid water is being supplied to the lavatory. Reference: Section 607.1, IPC 2024. If you have any questions about this review comment, I can be reached at Robert.Sherry@tucsonaz.gov |
||
| 09/22/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |