Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1125-02017
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/20/2025 | Site Zoning Standard | APPROVED | |||
| 11/07/2025 | Outdoor Lighting Standard | NOT REQUIRED | No modifications to the outdoor lighting | ||
| 11/07/2025 | Site Engineering Standard | NOT REQUIRED | |||
| 11/21/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 11/21/2025 | Commercial Building Standard | REQUIRES RESUBMIT | Please submit your revised documents and provide a letter with a written response letter addressing each of the comments indicating how the Building Review comments were resolved. Additionally, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. 1. Please amend the structural letter provided to determine the structural adequacy of the existing structure plans by having the letter sealed by an Arizona Registrant. Reference: Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304 Please contact me if you have any questions about these comments. Mark Masek Plans Examiner – Building Safety Planning and Development Services | City of Tucson main 520.837.4994 email mark.masek@tucsonaz.gov |
||
| 11/12/2025 | Commercial Electrical Standard | REQUIRES RESUBMIT | Commercial Electrical Review TC-COM-1125-02017 (4414 E SPEEDWAY BL TUCSON, AZ 85712) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC). 1. Provide interconnection method used for the Existing Service Panel and the New Siemens Panelboard. NEC 705.12(B). 2. Add warning labels for the New Siemens Panelboard per NEC 705.12(B)(2)(c). Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov |
||
| 11/21/2025 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 11/04/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |