Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - LIMITED v.1
Permit Number - TC-COM-1124-02217
Review Name: COMMERCIAL REVIEW - LIMITED v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 12/03/2024 | Commercial Electrical | APPROVED | |||
| 12/13/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 11/26/2024 | Commercial Building | REQUIRES RESUBMIT | Please submit your revised documents and provide a letter with a written response letter addressing each of the comments indicating how the Building or Structural Review comments were resolved. Additionally, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. 1. Please contact Pima County Addressing for selection of the suite number and use the same single suite number for both Phase 1 and Phase 2 on the plans. This will ensure a smooth transition at Phase 2 completion. IBC 107.2.1 2. Please amend occupant loads for each space/use to round up to next whole number as the occupant load shall be not less than that number determined by dividing the floor area under consideration by the occupant load factor assigned to the function of the space. IBC 1004.5 These numbers will be used to populate the C of O 3. Please amend Building Analysis Occupant Loads to show Phase 1 totals and Phase 2 totals separately and complete. For example, if Phase 1 shows 31 occupants and Phase 2 adds 18 more, the Phase 2 occupant load would be 48 occupants. This is the number of occupants that will be on the Phase 2 C of O. This C of O will supersede the Phase one C of O when Phase 2 is complete. IBC 107.2.1 4. Please amend plans to provide Required Plumbing Fixtures calculations accounting for the total number of occupants. IBC Table 2902.1 Please contact me if you have any questions about these comments. Mark Masek Plans Examiner – Building Safety Planning and Development Services | City of Tucson main 520.837.4994 email mark.masek@tucsonaz.gov |
||
| 12/04/2024 | Commercial Mechanical | REQUIRES RESUBMIT | 1. The balancing information shows that the Phase 2 area will have 294 CFM of air entering the suite with no exhaust. Combining phases 1 and 2, the total space will have 549 CFM of excess outside air. Provide a design that will ensure that the facility will comply with the odor mitigation requirements enforced by the Zoning Department. 2. How is the IT room being ventilated? Reference: Section 401.2, IMC 2018. |
||
| 12/04/2024 | Commercial Plumbing | REQUIRES RESUBMIT | The number of plumbing fixtures in phase 1 does not account for the total occupancy of phase 1 plus phase 2 construction. Calculate the number of required plumbing fixtures for the total area of phase 1 plus phase 2. Reference: Section 2902.1, IBC 2018. | ||
| 12/03/2024 | Fire New Construction | REQUIRES RESUBMIT | -Resolve all building comments. john.vincent@tucsonaz.gov 5203495581 |
||
| 12/05/2024 | Site Engineering | REQUIRES RESUBMIT | TC-COM-1124-02217 Resolve building comments |
||
| 12/13/2024 | Site Zoning | REQUIRES RESUBMIT | FROM: PDSD Zoning Review PROJECT: TC-COM-1124-02217 4695 N ORACLE RD Unit: 117 – C-3 Marijuana Facility: Dispensary (1st Review) TRANSMITTAL DATE: December 13, 2024 Resubmit revised drawings detailed response letter, which states how all Zoning Review Section comments were addressed. This site is located in the C-3 zone (UDC 4.7.22). Marijuana Facility: Dispensary is a permitted uses in this zone (Table 4.8-4), subject to a Mayor and Council Special Exception Procedure, Section 3.4.4 and Use Specific Standards 4.9.9.E.1. 1. As an expansion is proposed a Mayor and Council Special Exception Procedure, Section 3.4.4 must be submitted and approved prior to approval of this plan. 2. Clearly demonstrate that all requirements of UDC Article 4.9.9.E.1 are met. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
||
| 12/04/2024 | Water - PDSD | REQUIRES RESUBMIT | Provide the size of the water meter serving this suite, the size of the backflow preventer associated with the water meter, and the total water demand served by the water meter. Reference: Section 107.2.1, IBC 2018. | ||
| 11/19/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |