Permit Review Detail
Review Status: In Review
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1124-02135
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: In Review
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
N/A | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
N/A | Site Engineering | PENDING ASSIGNMENT | |||
N/A | Site Zoning | PENDING ASSIGNMENT | |||
N/A | Water - PDSD | PENDING ASSIGNMENT | |||
11/18/2024 | Commercial Electrical | REQUIRES RESUBMIT | Sheet G1.0 For questions in regards to plan review comments, please contact Bill McClellan by email at bmcclellan@willdan.com or cell (928)580-3179. All applicable comments followed by the initials (BM) 1. Sheet e1.1 Note #1 identifies power wall to be on platform above break room. No platform is in shell design. Clarify if all powerwall panels to be installed / designed on TI plans. Can note on shell plans for future installation 2. Sheet e3.0 Clarify SES type, noted as normal distribution board. 2018 IBC 107.2.1 (BM) |
||
11/18/2024 | Commercial Mechanical | REQUIRES RESUBMIT | 1. Sheet A8.0 bottom glass panels in EXT- main entry north side should also be identified as GT to meet temp glazing requirement 2018 IBC 2406.4.3 (BM) 2. sheet a8.0 Identify specific types of locks, latches and hardware for all doors to comply with 2018 IBC section 1010. Incomplete (BM) |
||
11/18/2024 | Commercial Plumbing | REQUIRES RESUBMIT | 1. Sheet p1.2 See gas supply notes on sheet p3.1 2. Sheet p3.1 Gas isometric plan identifies 4000 CFH for 1 1/2" piping. Pipe sizing does not meet IFGC table 402.4(5) table for 350' TDL. Equipment identified on plan totals 919 CFH. Clarify correct Fuel gas code on plans and CFH design per 2018 IFGC (BM) |
||
11/18/2024 | Commercial Structural | REQUIRES RESUBMIT | 1. Sheet g1.0 Will need to provide Geotech soils report for review that is identified in structural notes. Incomplete 2018 IBC 1803 (BM) 2. Sheet g1.0 Plan sheet index identifies civil and landscaping sheet. Incomplete in this package. Should provide a complete plan package. 2018 IBC 107.2.1 (BM) 3. Sheet g1.0 Provide a deferred submittal list on plans to include steel roof joist as noted in structural notes. 2018 IBC 107.3.4.1 (BM) 4. Sheet g1.0 Provide completed special inspection form for review for soils work and items listed in the structural section of plans. 2018 IBC 1705 (BM) 5. Sheet g1.0 Provide building thermal envelope compliance certificate to comply with 2018 IECC C402. Incomplete (BM) 6. Sheet g2.0 Provide additional exiting analysis to include minimum number of exits required for each space, accessible routes from each space, travel distance from most remote locations to each exit and both exits will meet requirements for common path of egress to public way or provide note on plans to be provided on TI plans. 2018 IBC sections 1006, 1007, 1009, 1017 & 1016, (BM) Note: Egress exiting shall not pass through stock / storage areas unless exit complies with 1016.2 Exception (2) [ Ver. 5 ] [Edited By Bill McClellan] 7. Sheetg2.0 Provide additional code analysis data to include actual building height, actual stories and possible platform / mezzanine area noted on electrical plan. Also correct allowable floor noted as S1, occupancy is identified as M. 2018 IBC 107.2.1 (BM) 8. Sheet a9.0 Wall details with 6" & 8" CMU reference to see structural for reinforcing. Structural plan details and schedules do not identify an CMU or reinforcing. Clarify design with steel stud wall framing. 2018 IBC 107.2.1 (BM) 9. Sheet a9.1 Details 11 & 12 identifies roof and canopy connection at CMU wall, structural details do not identify connections to or through CMU wall. Clarify 2018 IBC 107.2.1 (BM) |
||
11/17/2024 | Fire New Construction | REVIEW COMPLETED | |||
11/07/2024 | PDSD Application Completeness | REVIEW COMPLETED |