Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.4
Permit Number - TC-COM-1123-02748
Review Name: COMMERCIAL REVIEW - FULL v.4
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/29/2024 | Bldg Permits - Post Review | PENDING ASSIGNMENT | MASTER SET LOCATED AT: TC-COM-1222-00214/Laundry/Office (1025 E BENSON HY TUCSON, AZ 85713) WITH REVIEW NOTES TO BE COPIED ON TC-COM-1123-02746/Building: 2nd East Building, TC-COM-1123-02748/Building: East Building, TC-COM-1123-02750/Building: West Building, TC-COM-1123-02751/Building: North Building | ||
10/08/2024 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | MASTER SET LOCATED AT: TC-COM-1222-00214/Laundry/Office (1025 E BENSON HY TUCSON, AZ 85713) WITH REVIEW NOTES TO BE COPIED ON TC-COM-1123-02746/Building: 2nd East Building, TC-COM-1123-02748/Building: East Building, TC-COM-1123-02750/Building: West Building, TC-COM-1123-02751/Building: North Building Structural(S) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Denied Reason: Date Completed : 10/5/2024 6:51:54 PM Structural - Provide response letter addressing each comments for resubmission. 1. Sheet A-1/Codes – Provide applicable codes for City of Tucson IBC Local Amendments. California building codes are applied in this design document. Referencing California codes such as “CBC” instead of IBC’s. Also “California energy code” is not applicable listed in City of Tucson. Response to plan review comments not provided. (Closed) City of Tucson IBC Local Amendments • Amendments to the 2018 International Building Code • Amendments to the 2018 International Existing Building Code • Amendments to the 2018 International Energy Conservation Code • Amendments to the 2018 International Fuel Gas Code • Amendments to the 2018 International Mechanical Code • Amendments to the 2018 International Plumbing Code • Amendments to the 2018 International Residential Code • Amendments to the 2018 International Swimming Pool & Spa Code • Amendments to the 2017 National Electrical Code • Amendments to the 2018 International Fire Code • City of Tucson/Pima County Outdoor Lighting Code • Arizona Administrative Code Title 18 Chapter 5 for public and semi-public swimming pools • ICC A117.1 - 2009 Accessible and Usable Buildings and Facilities (by reference) Adopting Local Amendments to the Building Code is authorized by Ordinance #11590. 2. Provide clear structural scope of work. What are the demolished/existing and new structural components? Missing resubmission of structural, mechanical, plumbing and electrical sheets (only architectural resubmitted). Sheet A-2.3 shows 1 hour shaft enclosure and fire caulked, but A-7 does not show these details. (Closed) 3. Provide existing/demolition and new structural plans to clarify structure scope of work. (Closed) Structural(S) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Denied Reason: Date Completed : 10/5/2024 6:51:54 PM Structural - Provide response letter addressing each comments for resubmission. 1. Sheet A-1/Codes – Provide applicable codes for City of Tucson IBC Local Amendments. California building codes are applied in this design document. Referencing California codes such as “CBC” instead of IBC’s. Also “California energy code” is not applicable listed in City of Tucson. Response to plan review comments not provided. (Closed) City of Tucson IBC Local Amendments • Amendments to the 2018 International Building Code • Amendments to the 2018 International Existing Building Code • Amendments to the 2018 International Energy Conservation Code • Amendments to the 2018 International Fuel Gas Code • Amendments to the 2018 International Mechanical Code • Amendments to the 2018 International Plumbing Code • Amendments to the 2018 International Residential Code • Amendments to the 2018 International Swimming Pool & Spa Code • Amendments to the 2017 National Electrical Code • Amendments to the 2018 International Fire Code • City of Tucson/Pima County Outdoor Lighting Code • Arizona Administrative Code Title 18 Chapter 5 for public and semi-public swimming pools • ICC A117.1 - 2009 Accessible and Usable Buildings and Facilities (by reference) Adopting Local Amendments to the Building Code is authorized by Ordinance #11590. 2. Provide clear structural scope of work. What are the demolished/existing and new structural components? Missing resubmission of structural, mechanical, plumbing and electrical sheets (only architectural resubmitted). Sheet A-2.3 shows 1 hour shaft enclosure and fire caulked, but A-7 does not show these details. (Closed) 3. Provide existing/demolition and new structural plans to clarify structure scope of work. (Closed) Building(B) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Denied Reason: Date Completed : 10/6/2024 12:52:42 AM Building - Provide designer response letter answering each review comments. 1. Sheet A-1/Codes – Provide applicable codes for City of Tucson IBC Local Amendments. California building codes are applied in this design document. Referencing California codes such as “CBC” instead of IBC’s. Also “California energy code” is not applicable listed in City of Tucson. (Closed) City of Tucson IBC Local Amendments • Amendments to the 2018 International Building Code • Amendments to the 2018 International Existing Building Code • Amendments to the 2018 International Energy Conservation Code • Amendments to the 2018 International Fuel Gas Code • Amendments to the 2018 International Mechanical Code • Amendments to the 2018 International Plumbing Code • Amendments to the 2018 International Residential Code • Amendments to the 2018 International Swimming Pool & Spa Code • Amendments to the 2017 National Electrical Code • Amendments to the 2018 International Fire Code • City of Tucson/Pima County Outdoor Lighting Code • Arizona Administrative Code Title 18 Chapter 5 for public and semi-public swimming pools • ICC A117.1 - 2009 Accessible and Usable Buildings and Facilities (by reference) Adopting Local Amendments to the Building Code is authorized by Ordinance #11590. 2. All sheets - Provide construction documents ready to be issued for construction. Registered design professionals signed the documents as “PRELIMINARY PLANS NOT FOR CONSTRUCTION.” “preliminary plans not for construction” is still indicated in the title block of all sheets. (Closed) 3. Sheet A-1 lists sheet index still incomplete missing COMcheck/energy calculations and mechanical sheets 4. Sheet A-1 – List detailed scope of work for each building under separate permit numbers and area of them (SF) – Laundry/office still missing. Type of construction shown as “Type lll” Is it Type lll-A or lll-B accordance with 2018 IBC Table 601? What is “Type lll-R-1?” Type lll construction has 2-hour exterior bearing walls is this true? Provide code analysis for each building under separate permit numbers. Type lV is heavy timber construction per 2018 IBC chapter 6. 5. Sheet A-1 – Building code analysis: Provide occupancy load calculations for each building (still missing – only total occupancy load provided). TC-COM-1222-00214, TC-COM-1123-02746, TC-COM-1123-02748, TC-COM-1123-02750, TCCOM-1123-02751. Only total occupancy of “143.43” was provided. Each building will have its own occupancy load calculation. 6. Provide the corresponding building number or names to each permit. What are the deferred submittals for each building? (Closed) 7. Clearly state the scope of work for each building of each engineering disciplines: architectural, structural, mechanical, plumbing and electrical. Scope of work does not identify the scopes of each building: East building, 2nd east building, north building, west building, laundry/office. Laundry area still missing. Building areas and occupancy loads are used in inspection form and certifications of occupancies so please provide for individual building. A-1 project data shows no sprinkler system but corridor fire resistance ratings are set for sprinkler. 8. Sheet A-1 – Clarify the attached laundry room. Is this a separate building or attached to building North or East? Clearly show the limit of each building such as 2nd East building seem to be attached to front desk area. Sheet 2/A-3.10 is labeled as “laundry area floor plan” but does not show washer and/or dryer. No plumbing and/or electrical scope of work. Mechanical work for laundry room still missing. (Closed) 9. Sheet A-1 - What is the list of separate permits? List is missing. (Closed) 10. Sheet A-1 - Any deferred submittals list? Deferred submittals not identified. Any modifications to fire sprinkler and/or fire alarm systems for example? (Closed) 11. Sheet A-1 - Project data doesn’t include scope of fire alarm system (NFPA 72). Is the existing fire alarm going to be modified under separate permit or deferred submittal since changing of occupancy classification? (Closed) 12. Sheet A-1 - Parking tabulation doesn’t provide required ADA/accessible space. Also show in site plan the location of accessible route of travel to/from the building entry. Accessible parking count still missing per 2018 IBC table 1106.1. (Closed) 13. Sheet A-1 - Occupancy load calculation for each building still missing. Provide complete occupancy calculations for each building. How does each building occupant add to 850 occupants? Referencing “CBC” for maximum floor area allowances. Sheet A-1.1 floor plan general note references California building codes and for single resident codes (Sheet A-1 proposes R-2 occupancy not R-3). 14. Sheet A-1 - Provide plumbing fixture calculation per 2018 IBC section 2902 and 2018 IPC table 403.1 Hotels and apartments are different classification under this table. For example, apartment house requirements show “1 kitchen sink per dwelling unit; 1 automatic clothes washer connection per 20 dwelling units.” Show required and provided fixture counts for buildings including office area such as service sink and drinking fountain requirements. (Closed) 15. Sheet A-1 – 1/Existing Site Plan shows key notes for new fence and gates. Identify/show the fire apparatus access roads per 2018 International Fire Code section 503. Locate the fire hydrant in site plan (2018 International Fire Code section 507.5). Still missing from site plan. 16. Provide design per applicable codes: California building codes still referenced in design such as Sheet A-1. (Closed) 17. Sheet A-2 indicates a restaurant. Is the existing restaurant also provided with sprinkler system? 2018 IBC table 508.4 shows 1 or 2 fire separation between A and R occupancies – What is the existing wall fire rating and assembly? Sheet A-2.5 does not clarify existing and new. Show existing/demolition plan and proposed floor plan to clarify scope of work, Typical. (Closed) 18. Sheet A-2.1 – All the rooms are not labeled in “front desk floor plan.” Provide scope of work for this layout? Is this an existing/demolition or new plan? Is this building part of 2nd East Building? (Closed) 19. Sheet A-2.4, A-2.5, A-2.6 – Provide complete life safety plan showing means of egress information such as required and provided exit distance, common path of travel, dead end corridor length if any, and fire separations between buildings referring to 2018 International Building Code Chapter 10. California building code is referenced sheet A-1.1. Fire separation distance dimensions are incorrect. Comply with 2018 IBC chapter 2 definition of fire separation distance that is not building face to face. 20. Sheet A-2.3 – Provide complete existing/demolition floor plans and new floor plans to clarify the scope of work. Existing/demolition and new floor plans still missing to clarify scope of work. What is the finish scope of work? Finish schedule if providing new finish. 2018 IBC table 803.13 Group R-2 identifies interior wall and ceiling finish grades. New ADA bathroom fixtures and existing fixtures do not match. Coordinate with plumbing. 21. Sheet A-2.3 and A-2.4 – Overall plans do not indicate location of each unit such as unit A, B, C and D. Second floor balconies missing guard rails compliance with 2018 IBC section 1015. (Closed) 22. Sheet A-2.6 – Still showing I-2 (institutional) travel distance and common path of egress travel are identified. (Closed) 23. Provide 2nd floor means of egress plan/life safety plan that’s accordance with applicable code. California building code is referenced. Longest exit access length should be measured from inside the end of apartment room not from the hallway. 24. Sheet A-2.7 – Clearly indicate the locations of the ADA rooms. The room labels are too small to read. Show the accessible route of travels on 1st and 2nd floors. Where are the elevators for accessible route of travel between the floors? Provide accessible details complying with (Closed) 25. Sheet A-2.3 shows 14 ADA rooms provided so identify their locations. (Closed) 26. Provide existing reflected ceiling plans that are missing. Do the ceiling heights comply with 2018 International Building Code Chapter 10 Section 1003.2? Are the existing lights to remain? A-7.1 detail 17 shows new Gyp. Bd. Ceilings but response letter states no ceiling work (conflicting information). 27. Cross reference ADA details shown in A-7 and A-7.1 to clarify scope. For example, are all the doors in ADA units being replaced to achieve the detail 6 and 7 at sheet A-7? 2009 ICC A117.1 section 1003.11.2.4 water closet clearance missing in enlarged bathroom plan 1. 28. Show in sheet A-1 the roof scope of work. Roof notes are shown in sheet A-1.1 and P-1.0 although response letter stating no roof work (conflicting information). 29. Sheet A-7.1 shows stair handrail details where are these applied? Provide cross reference of details. (Closed) 30. Please clarify the exterior scope. Sheet A-7.1 shows accessible ramps so where are they? Description of detail 13 at A7.1 is missing. Is this an exterior ladder? Exterior elevations depict guard rails at the second story balconies so do they meet 2018 IBC section 1015? (Closed) 31. Sheet A-3 – Scope of work is not defined at the hallway and A-3.9 meeting room. What are the demolition and new work in the hallway and meeting room? 32. 8. M-3.0 – Detail 1 shows new intake L1 louver opening at exterior wall note 5 showing “Architectural finish per architects direction” but Architectural detail missing – show weather proofing of this exterior opening. 33. Sheet A-1 – Sheets P-1.1 and P-1.2, M-1.1 and E-1.0 shows future proposed building inside the courtyard. Maximum area of exterior wall openings based on fire separation distance and degree of opening protection in 2018 IBC table 705.8. Show the fire separation distances. Mechanical(M) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Denied Reason: Date Completed : 10/5/2024 8:06:52 PM Mechanical - Provide designer response letter answering each review comments. 1. Sheet A-1/Codes – Provide applicable codes for City of Tucson IBC Local Amendments. California building codes are applied in this design document. Referencing California codes such as “CBC” instead of IBC’s. Also “California energy code” is not applicable listed in City of Tucson. Response to plan review comments not provided. Are the cooking ranges new or existing? Laundry room dryer exhaust not shown. How is this room ventilated per 2018 IMC chapter 4? (Closed) City of Tucson IBC Local Amendments • Amendments to the 2018 International Building Code • Amendments to the 2018 International Existing Building Code • Amendments to the 2018 International Energy Conservation Code • Amendments to the 2018 International Fuel Gas Code • Amendments to the 2018 International Mechanical Code • Amendments to the 2018 International Plumbing Code • Amendments to the 2018 International Residential Code • Amendments to the 2018 International Swimming Pool & Spa Code • Amendments to the 2017 National Electrical Code • Amendments to the 2018 International Fire Code • City of Tucson/Pima County Outdoor Lighting Code • Arizona Administrative Code Title 18 Chapter 5 for public and semi-public swimming pools • ICC A117.1 - 2009 Accessible and Usable Buildings and Facilities (by reference) Adopting Local Amendments to the Building Code is authorized by Ordinance #11590. 2. C0.1 – References IECC year 2021 while City of Tucson adopts 2018. Still missing complete response letter. 3. Mechanical sheets missing. Provide mechanical scope of work. Provide existing/demolition and new mechanical plans to clarify scope of work. For example, locate the exhaust fans shown in detail 15 of sheet A-8. Where are the mechanical floor plans, equipment schedule, ventilation calculations and energy code calculations? Still missing resubmission and response letter. Hotels and multiple residence occupancy classifications are different in 2018 IMC table 403.3.1.1 so provide ventilation calculation for 5 buildings to show compliance (only laundry area provided – missing residential areas). (2018 IBC section 106.3.1). 4. Provide mechanical schedule and locate on plan the HVAC units identified in sheet A-9. Still missing existing mechanical air handling equipment in schedule and designer response letter. (2018 IBC section 106.3.1). 5. Provide gas plan and gas calculation including individual and total developed pipe lengths, pipe sizes and loads per 2018 International Fuel Gas Code. Gas supplied tankless water heater is shown in detail 13 of sheet A-9. Still missing resubmission and response letter. (2018 IBC section 106.3.1). 6. Still missing designer comments response of structural, mechanical, plumbing and electrical issues (only architectural responded in letter and resubmitted). Missing resubmission and response letter. 7. New cooking range is shown in each residence so how are these exhausted in mechanical plan? Missing resubmission and response letter. 8. Energy code compliance report resubmitted is for 2133 SF single family residence in Lomita, California. (2018 IECC C401.2). Resubmit energy calculation for this project that consists of 5 buildings. 9. Laundry room ventilation and dryer exhaust plan and details missing. (Closed) 10. A-1.1 – Floor plan note still reference “C.B.C, C.M.C, C.P.C & C.E.C” for California project (Construction documents should be for applicable code for City of Tucson). Electrical(E) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Denied Reason: Date Completed : 10/5/2024 7:52:53 PM Electrical - Resubmit including designer response letter answering each reviewer comment. 1. Sheet A-1/Codes – Provide applicable codes for City of Tucson IBC Local Amendments. California building codes are applied in this design document. Referencing California codes such as “CBC” instead of IBC’s. Also “California energy code” is not applicable listed in City of Tucson. Response to plan review comments and revised electrical sheets not provided. (Closed) City of Tucson IBC Local Amendments • Amendments to the 2018 International Building Code • Amendments to the 2018 International Existing Building Code • Amendments to the 2018 International Energy Conservation Code • Amendments to the 2018 International Fuel Gas Code • Amendments to the 2018 International Mechanical Code • Amendments to the 2018 International Plumbing Code • Amendments to the 2018 International Residential Code • Amendments to the 2018 International Swimming Pool & Spa Code • Amendments to the 2017 National Electrical Code • Amendments to the 2018 International Fire Code • City of Tucson/Pima County Outdoor Lighting Code • Arizona Administrative Code Title 18 Chapter 5 for public and semi-public swimming pools • ICC A117.1 - 2009 Accessible and Usable Buildings and Facilities (by reference) Adopting Local Amendments to the Building Code is authorized by Ordinance #11590. 2. Electrical sheets indicated as “progress set not for construction” so please provide release for construction labeling for building permit. (Closed) 3. What is the outdoor lighting scope? If new exterior lighting, then comply with City of Tucson/Pima County Outdoor Lighting Code. Missing resubmission and response letter. (Closed) 4. Sheet A-1.4 shows required EV spaces what is the EV scope for this project? Any details? Designer response letter still missing. 5. Sheet E-0.1 – Identify the underground conductors colors identified in City of Tucson Amendments to the 2017 National Electrical Code. Missing response letter. 6. Sheet E-5.0 – Provide panel schedule that’s missing. Include panel numbers, voltage, phasing, location, bus size, circuit number, breaker sizing, number of poles, A.I.C rating, number of lights and/or receptacles by circuit, total KVA load. Include fixture and equipment schedule. Missing resubmission and response letter. (Closed) 7. Energy code compliance report resubmitted is for 2133 SF single family residence in Lomita, California. (2018 IECC C401.2). Resubmit energy calculation for this project that consists of 5 buildings. 8. A-1.1 – Floor plan note still reference “C.B.C, C.M.C, C.P.C $ C.E.C” for California project (Construction documents should be for applicable code for City of Tucson). Plumbing(P) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Denied Reason: Date Completed : 10/5/2024 7:25:12 PM Plumbing – Provide designer response letter stating for each review comment. 1. Sheet A-1/Codes – Provide applicable codes for City of Tucson IBC Local Amendments. California building codes are applied in this design document. Referencing California codes such as “CBC” instead of IBC’s. Also “California energy code” is not applicable listed in City of Tucson. Response to plan review comments and revised plumbing sheets not provided. (Closed) City of Tucson IBC Local Amendments • Amendments to the 2018 International Building Code • Amendments to the 2018 International Existing Building Code • Amendments to the 2018 International Energy Conservation Code • Amendments to the 2018 International Fuel Gas Code • Amendments to the 2018 International Mechanical Code • Amendments to the 2018 International Plumbing Code • Amendments to the 2018 International Residential Code • Amendments to the 2018 International Swimming Pool & Spa Code • Amendments to the 2017 National Electrical Code • Amendments to the 2018 International Fire Code • City of Tucson/Pima County Outdoor Lighting Code • Arizona Administrative Code Title 18 Chapter 5 for public and semi-public swimming pools • ICC A117.1 - 2009 Accessible and Usable Buildings and Facilities (by reference) Adopting Local Amendments to the Building Code is authorized by Ordinance #11590. 2. Plumbing sheets indicated as “progress set not for construction” so please provide release for construction labeling for building permit. Missing resubmission and response letter. (Closed) 3. Sheet P-2.0 through P-3.0 plumbing plan does not identify the ADA/accessible rooms. Show compliance with ICC A117.1 -2009 chapter 6. Plumbing Elements and Facilities. ADA fixture details are also missing. (Closed) 4. Sheet P-3.0 – Provide complete vent riser diagram for 2 story structure. Still missing resubmission and response letter and vent riser diagram. ADA lavatory and toilets appear to be new fixtures with new lines. (2018 IPC section 106.3.1 Construction documents) 5. Sheet P-3.0 – Fixture unit calculations show two “West Buildings” while plumbing site plan P-1.1 shows two “East Buildings.” Clarify or match the labeling. Missing resubmission and response letter. 6. Laundry washer and dryer plan/details still missing. (2018 IPC section 106.3.1 Construction documents) (Closed) 7. A-1.2 and P-2.2, typ. – Existing architectural water closet and lavatory fixture’s locations do not match existing and proposed ADA toilet locations closer to the door with note stating. Plumbing keynote 1 states “existing fixture to remain”, but they do not match existing architectural drawings. Provide existing/demolition plumbing floor plan to clarify for all buildings (2018 IBC section 106.3.1). 8. P-3.1 and proposed waste line plans missing cleanout locations (2018 IPC section 708). 9. P-3.1 – One 2-inch vent covering for 8 washers that totals 16 (residential) – 24 (commercial) fixture units while allowable stack drainage fixture units per 2018 IPC 710.1(2). Show stack drain size compliance. 10. P-3.1 – The waste from an automatic clothes washer shall discharge through an air break into a standpipe in accordance with section 802.3.3 or into a laundry sink – Show this compliance (2018 IBC section 406.2) 11. P-3.1 and P-2.8 – Laundry floor drains missing accordance with 2018 IPC 413.4. 12. Sheet P-1.0 / Architectural roof plans – Roof drains and overflow drain piping and fittings indicated but missing roof scope of work. Provide the roofing scope of work in architecture and plumbing document that matches. |
||
09/27/2024 | Fire New Construction | REQUIRES RESUBMIT | -This is a change of use from R1 to R2. Per the IEBC, Chapter 10, 1004, 1011, fire sprinklers are required. Please make a note stating fire sprinklers will be installed and separate permits required. -Make a note stating fire alarm to be modified/upgraded to comply with R2 requirements and will require a separate permit. john.vincent@tucsonaz.gov 5203495581 MASTER SET LOCATED AT: TC-COM-1222-00214/Laundry/Office (1025 E BENSON HY TUCSON, AZ 85713) WITH REVIEW NOTES TO BE COPIED ON TC-COM-1123-02746/Building: 2nd East Building, TC-COM-1123-02748/Building: East Building, TC-COM-1123-02750/Building: West Building, TC-COM-1123-02751/Building: North Building |
||
10/29/2024 | Site Zoning | REQUIRES RESUBMIT | MASTER SET LOCATED AT: TC-COM-1222-00214/Laundry/Office (1025 E BENSON HY TUCSON, AZ 85713) WITH REVIEW NOTES TO BE COPIED ON TC-COM-1123-02746/Building: 2nd East Building, TC-COM-1123-02748/Building: East Building, TC-COM-1123-02750/Building: West Building, TC-COM-1123-02751/Building: North Building ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: TC-COM-1222-00214, TC-COM-1123-02746, TC-COM-1123-02748, TC-COM-1123-02750 & TC-COM-1123-02751 1025 N. Benson Hy. – C-2/I-1 Convert Travelers Accommodation, Lodging to Multifamily (3rd Review) TRANSMITTAL: May 13, 2024 Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Site Zoning Review Section comments were addressed. Submit a development package. This site is located in the C-2 & I-1 zone, (UDC 4.7.21 & 4.7.29). Multifamily is an allowed use in the C-2 Zone, (UDC Table 4.8-4), but is not an allowed use in the I-1 Zonie, (UDC Table 4.8-5). 1. COMMENT: Comments from prior reviews remain unaddressed. Comments are provided again below. 2. COMMENT: This comment was not addressed. Per UDC Article 3.3.3.G.2.c A site plan (Development Package) is required for the following types of development: Existing development undergoing a change of use, building structure additions, and/or a reconfiguration of an area outside a building. A development package (DP) meeting the requirements of Administrative Manual (AM) 2-06 must be submitted and approved prior to approval of these building plans. Also, for permit TC-COM-1123-02751 to be approved either a rezoning must be approved or the DP shall clearly demonstrate that the requirements of UDC Article 1.4.2.E are met. If you have any questions about this transmittal, please contact Fernando Garcia at fernando.garcia2@tucsonaz.gov. |
||
10/24/2024 | Water - PDSD | REQUIRES RESUBMIT | MASTER SET LOCATED AT: TC-COM-1222-00214/Laundry/Office (1025 E BENSON HY TUCSON, AZ 85713) WITH REVIEW NOTES TO BE COPIED ON TC-COM-1123-02746/Building: 2nd East Building, TC-COM-1123-02748/Building: East Building, TC-COM-1123-02750/Building: West Building, TC-COM-1123-02751/Building: North Building Show the location and size of the water meter, backflow preventer, and the water service pipe on a site plan. Provide the total water demand served by the water meter. Reference: Section 107.2.1 and 107.2.6, IBC 2018. |
||
09/24/2024 | PDSD Application Completeness | REVIEW COMPLETED |