Permit Number: TC-COM-1123-02674
Parcel: 12007359A

Address:
413 W AJO WY

Review Status: Requires Resubmit

Review Details: COMMERCIAL PDSD SIMPLE REVIEW v.1

Permit Number - TC-COM-1123-02674
Review Name: COMMERCIAL PDSD SIMPLE REVIEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
11/20/2023 Bldg Permits - Post Review Express PENDING ASSIGNMENT
11/20/2023 Commercial Electrical REQUIRES RESUBMIT Please address the electrical plan review comments and provide a written response.

1. This is a commercial project, requiring all documents to be prepared, sealed, signed, and dated by a registered design professional. Provide complete electrical plans, design, and calculations, sealed by an Arizona Registrant. Reference: Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304, 2018 IBC section 107.1, 2017 NEC, City of Tucson Commercial Plan Submittal Requirements

2. What is the new 200 amp electrical service going to connect to in the shop?

3. An Underground Service Waiver to install the new service utilizing an overhead service drop from the utility will need to be approved by the Building Official as a variance to the requirements of the 2018 IBC Amendment 112.1.1 as adopted by the City of Tucson. The form for the waiver can be prited or downloaded from www.tucsonaz.gov/pdsd website.

2018 IBC Amendment Section 112.1.1 Service conductors. All service conductors, power and communication, shall be installed underground for all new construction. The requirement for underground conductors may be waived by the Building Official where: 1. Existing buildings on the block are served with overhead conductors or where a lot to be constructed upon is one of three or fewer abutting vacant lots making up less than 40 percent of the total acreage of the block (not including street or right-of-way) or where a vacant area is less than 60,000 square feet. 2. The installation, when compared to the use of overhead conductors, would create a hazard or not be feasible. A feasibility study will be required at the time the request for waiver is made.
11/15/2023 PDSD Application Completeness Express REVIEW COMPLETED