Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1123-02668
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/29/2024 | Site Zoning | APPROVED | |||
04/30/2024 | Water - PDSD | APPROVED | |||
04/24/2024 | Site Engineering | NOT REQUIRED | |||
04/30/2024 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
04/09/2024 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Madeline Nelson mnelson@safebuilt.com Approved Reason: Date Completed : 4/5/2024 11:35:01 PM Building(B) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 4/3/2024 8:34:27 AM 1. General: Show the revised design and area details on all affected sheets. Include the changes in the scope of work, increase of tenant and work floor area, occupant calculations, add S-1 use group, separation wall rating, etc. on the cover sheet. Include the new and existing details for lighting, emergency lighting, means of egress routes, exit signs, sprinklers, fire alarms, fixtures and shelving, reflected ceiling plans, finishes, add the new door in the door schedule, changes to the key plans, accessibility details, etc. as needed for the new scope of work and additional space included in the project. (2018 IBC section 107) Mechanical N/A Electrical(E) Reviewer Ron Ross rross@safebuilt.com Approved with Comments Reason: Date Completed : 4/1/2024 4:32:29 PM 1. Need to coordinate RTU-1 electrical OCP and conductor feeds to support Mechanical revision change as called out on sheet M01.01 Rooftop Heat Pump Schedule 'Electrical'. Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Denied Reason: Date Completed : 4/9/2024 2:44:47 PM Revised plan Plumbing Review: 1). Plan Sheet P03.01: lift tank detail is missing the shut off valve. Add the required shut off valve on the discharge side of the check valve in accordance with -2018 IPC 712.2 First Plumbing Review |
||
04/01/2024 | Fire New Construction | REVIEW COMPLETED | |||
04/01/2024 | PDSD Application Completeness | REVIEW COMPLETED |