Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1123-02577
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/24/2023 | Commercial Building | APPROVED | |||
12/08/2023 | Site Engineering | APPROVED | |||
11/16/2023 | Site Zoning | APPROVED | |||
12/08/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
12/04/2023 | Commercial Electrical | REQUIRES RESUBMIT | Please address the electrical plan review comments and provide a written response. Provide evidence on the site lighting plans that the proposed exterior lighting fully complies with the Outdoor Lighting Code. See section 104 for plan submittal requirements. 1. Provide site lighting plans with the following information on the plans; (a) Provide a complete luminaire schedule that correlates with the lumen calculations and site lighting plan(s). (b) Full compliance with sections 104.2.1(1), (2), (3). (c) Verify compliance for Commercial Property adjacent to residential property if applicable. See Sections 401.3.1 thru 401.3.4. (d) Show the locations for all lighting New and Existing. 2 See table 401.1, lighting area and option and indicate this information in the lighting site plan, also showing the locations and types of all exterior luminaires including existing. 3 402.1 (light source color temperature requirements), shielding requirements, etc . 4 Provide calcs for total lumens allowed and total lumens proposed per acre including existing, for Full Cut Off and Unshielded per table 401.1. Lumen calculations need to include all exterior lighting New and Existing. 5 Indicate whether or not a special inspection is required per sec. 104.2.2, and 106.2. 6 Specify any exceptions used. 7 Curfew lighting controls If applicable. 8 Provide complete compliance with the 2018 IECC for the exterior lighting. Do not confuse the Outdoor Lighting Code with the IECC. Ref; 2018 IBC section 107.2.1, 2017 NEC, 2012 City of Tucson Outdoor Lighting Code. |
||
11/07/2023 | PDSD Application Completeness | REVIEW COMPLETED |