Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1123-02565
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/09/2023 | Site Zoning | APPROVED | MASTER SET LOCATED AT: TC-COM-1023-02508 (320 N CAMPBELL AV TUCSON, AZ 85719)WITH REVIEWS TO BE PERFORMED ON: TC-COM-1123-02566 (330 N CAMPBELL AV TUCSON, AZ 85719), TC-COM-1123-02565 (328 N CAMPBELL AV TUCSON, AZ 85719), TC-COM-1123-02564 (326 N CAMPBELL AV TUCSON, AZ 85719), TC-COM-1123-02563 (324 N CAMPBELL AV TUCSON, AZ 85719) & TC-COM-1123-02562 (322 N CAMPBELL AV TUCSON, AZ 85719) Studio Session 824-478-541 |
||
| 11/27/2023 | Site Engineering | NOT REQUIRED | MASTER SET LOCATED AT: TC-COM-1023-02508 (320 N CAMPBELL AV TUCSON, AZ 85719)WITH REVIEWS TO BE PERFORMED ON: TC-COM-1123-02566 (330 N CAMPBELL AV TUCSON, AZ 85719), TC-COM-1123-02565 (328 N CAMPBELL AV TUCSON, AZ 85719), TC-COM-1123-02564 (326 N CAMPBELL AV TUCSON, AZ 85719), TC-COM-1123-02563 (324 N CAMPBELL AV TUCSON, AZ 85719) & TC-COM-1123-02562 (322 N CAMPBELL AV TUCSON, AZ 85719) Studio Session 824-478-541 |
||
| 11/27/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | MASTER SET LOCATED AT: TC-COM-1023-02508 (320 N CAMPBELL AV TUCSON, AZ 85719)WITH REVIEWS TO BE PERFORMED ON: TC-COM-1123-02566 (330 N CAMPBELL AV TUCSON, AZ 85719), TC-COM-1123-02565 (328 N CAMPBELL AV TUCSON, AZ 85719), TC-COM-1123-02564 (326 N CAMPBELL AV TUCSON, AZ 85719), TC-COM-1123-02563 (324 N CAMPBELL AV TUCSON, AZ 85719) & TC-COM-1123-02562 (322 N CAMPBELL AV TUCSON, AZ 85719) Studio Session 824-478-541 |
||
| 11/07/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 11/7/2023 12:25:58 PM See the building review comments. Building(B) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 11/7/2023 12:24:36 PM Please make revisions to all sets of plans. 1) General: Include the details and REScheck showing compliance with the 2018 IECC for the envelope, windows, and doors. 2) General: Include a building section view detailing the new or existing floor joists or slab/foundation, wall, and roof framing and insulation. (2018 IRC section R106) 3) Sheet A1.0 (Cover Sheet): The incorrect accessibility code is shown on the list of code. The currently adopted accessibility code is the 2009 ICC A117.1. 4) Sheet A1.0 (Cover Sheet): Include the building height and number of stories in the general building summary. (2018 IRC section R106) 5) Sheet A1.0 (Cover Sheet): Show the distances of the buildings to the property lines. (2018 IRC section 302) 6) Sheet A2.0 (Floor Plans): Specify the windows in hazardous locations are safety glazed. (2018 IRC section 308.4) 7) Sheet A2.0 (Floor Plans): Show the attic access and crawl space access as applicable. (2018 IRC sections R408.4, R807) 8) Sheet A3.0 (Floor Plans): Clarify location (under floor joists or ceiling) of new beam shown in Model B units. Identify the bearing walls. (2018 IRC section R106) 9) Sheet A3.0 (Floor Plans): According to roof framing notes, the roof is being reframed and sheathed. Include the ceiling and roof assembly details/drawings with insulation R-values shown. Provide the elevation views and roof plans of the buildings. (2018 IRC section R106) 10) Sheet A3.0 (Floor Plans): Include floor details and flooring scope of work. (2018 IRC section R106) 11) Sheet M1.0 (Mechanical Plans): Show the location, support structure, and access of the HVAC equipment on roof plans. No roof plans are included in the plans and the type of roof is unknown. (2018 IRC section R106) 12) Sheet E1.0 (Electrical Details and Drawings): Note #27 does not show the correct percentage of high-efficiency lighting. The 2018 IECC section R404.1 requires a minimum of 90% of the total lighting to be high efficiency. 13) Sheet E1.0 (Electrical Details and Drawings): The subpanels are shown as only 60 amp rated but the panel schedules, calculations, and one-line diagram show 100-amp panels are being installed. Please coordinate and revise the plans. (2018 IRC section R106) Mechanical(M) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 11/7/2023 12:25:27 PM See the building review comments Electrical(E) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 11/7/2023 12:25:07 PM See the building review comments. Plumbing(P) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 11/7/2023 12:25:41 PM See the building review comments. |
||
| 11/01/2023 | PDSD Application Completeness Express | REVIEW COMPLETED | MASTER SET LOCATED AT: TC-COM-1023-02508 (320 N CAMPBELL AV TUCSON, AZ 85719)WITH REVIEWS TO BE PERFORMED ON: TC-COM-1123-02566 (330 N CAMPBELL AV TUCSON, AZ 85719), TC-COM-1123-02565 (328 N CAMPBELL AV TUCSON, AZ 85719), TC-COM-1123-02564 (326 N CAMPBELL AV TUCSON, AZ 85719), TC-COM-1123-02563 (324 N CAMPBELL AV TUCSON, AZ 85719) & TC-COM-1123-02562 (322 N CAMPBELL AV TUCSON, AZ 85719) Studio Session 824-478-541 |