Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TC-COM-1122-00191
Parcel: 10818003B

Review Status: Requires Resubmit

Review Details: COMMERCIAL PDSD SIMPLE REVIEW v.2

Permit Number - TC-COM-1122-00191
Review Name: COMMERCIAL PDSD SIMPLE REVIEW v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
07/03/2023 Commercial Electrical APPROVED
06/29/2023 Commercial Mechanical NOT REQUIRED
07/03/2023 Bldg Permits - Post Review PENDING ASSIGNMENT
06/29/2023 Commercial Plumbing REQUIRES RESUBMIT 1. Revise the location of the sediment trap in detail 1/MP0.3 to be downstream of the appliance shut off valve, as close to the equipment as possible. Reference: Section 408.4, IFGC 2018.
2. Revise the configuration of the natural gas sediment trap, as shown in detail 1/MP2.1, to comply with the requirements of Section 408.4, IFGC 2018 (i.e. the trap is to be in the bottom opening of the run of the tee, and the supply to the appliance is to be in the branch of the tee).
3. Clarify how the natural gas piping is to serve the two tankless water heaters in each system when it is only connected to the hot water storage tank. Reference: Section 107.2.1, IBC 2018.
4. How do the liquid combustion byproducts (i.e. condensate) drain from the hot water storage tanks? Show the proposed discharge location of the condensate. Reference: Section 314.1, IPC 2018.
5. Provide a detail showing how the cold water, hot water, and return hot water connect the tankless water heaters and the hot water storage tanks. Reference: Section 107.2.1, IBC 2018.
6. Verify that there is sufficient space for maintenance of the tankless water heaters and the hot water storage tanks based on the manufacturer’s installation instructions. Reference: Section 502.5, IPC 2018.
06/23/2023 PDSD Application Completeness REVIEW COMPLETED