Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1122-00179
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/12/2023 | Commercial Mechanical | REQUIRES RESUBMIT | Spaces in which factory-built recirculating hoods tested in accordance with UL 710B are installed are considered to be kitchens and shall be ventilated per Section 403.3.1.1, IMC 2018. The minimum exhaust rate shall be 0.70 CFM per square foot, using a minimum area of 100 square feet for each individual cooking appliance (e.g. the two ovens that are being installed). Reference: Section 507.1, exception 2, IMC 201. | ||
01/12/2023 | Commercial Plumbing | REQUIRES RESUBMIT | 1. Connect the effluent of the sump pump to the sanitary drain system as described in Section 712.3.5, IPC 2018. The sump pump shall not terminate as an indirect waste. Reference: Section 301.3, IPC 2018. 2. Install a vent for the sump basin per the manufacturer’s instructions. Installation of the air admittance valve (“mini-vent”) as shown in detail 5/P1.1 will not allow air to flow out of the basin when the basin is filling, resulting in air binding of the basin. Reference: Section 303.2, IPC 2018. |
||
12/08/2022 | PDSD Application Completeness | REVIEW COMPLETED |