Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TC-COM-1122-00179
Parcel: 12911001J

Address:
920 E 22ND ST

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.4

Permit Number - TC-COM-1122-00179
Review Name: COMMERCIAL REVIEW - FULL v.4
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
03/07/2023 Commercial Mechanical APPROVED
03/07/2023 Bldg Permits - Post Review PENDING ASSIGNMENT
03/07/2023 Commercial Plumbing REQUIRES RESUBMIT Assuming the specified sump pump is operating against a 20’ head, the discharge will be approximately 25 GPM. Per Section 709.3, IPC 2018, the flow rate would be equivalent to 50 drainage fixture units (1 GPM = 2 dfu). A 2” vertical stack cannot accommodate 50 dfu; a 4” vertical stack would be needed (Table 710.1 (2), IPC 2018). [Second comment: Comment not resolved. The effluent from the sump pump may not be connected indirectly to the sanitary drain system.] [Initial comment: Connect the effluent of the sump pump to the sanitary drain system as described in Section 712.3.5, IPC 2018. The sump pump shall not terminate as an indirect waste. Reference: Section 301.3, IPC 2018.]