Permit Review Detail
Review Status: Requires Resubmit
Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Permit Number - TC-COM-1122-00146
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/30/2023 | Other Inspection Reports (Deferred Submittal) | APPROVED | |||
11/30/2023 | Post-Installed Anchor Inspection (Deferred Submittal) | APPROVED | |||
11/30/2023 | Welding Inspection (Deferred Submittal) | APPROVED | |||
11/30/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
11/30/2023 | Air Balancing/Commissioning Report (Deferred Submittal) | REQUIRES RESUBMIT | The air flowrates for FC-6 and FC-8 are more than 10% below the design values. Consult with the responsible mechanical engineer to determine the necessary revisions, re-balance and resubmit. (Note: the report for FC-15 appears to have a typographical error.) Reference: Section 403.3.1.5, IMC 2018. | ||
11/30/2023 | Water Sterilization Report (Deferred Submittal) | REQUIRES RESUBMIT | The required water disinfection report is not an analysis of the inorganic chemicals in the water. Section 610.1 of the 2018 International Plumbing Code describes the testing requirements. Your report should contain a narrative of what water distribution system was tested and the method used to disinfect the water distribution system and the report of the bacteriological examination by a licensed testing laboratory. | ||
11/30/2023 | PDSD Application Completeness | REVIEW COMPLETED |