Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Approved
Review Details: COMMERCIAL REVIEW - FULL v.3
Permit Number - TC-COM-1122-00121
Review Name: COMMERCIAL REVIEW - FULL v.3
Review Status: Approved
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/10/2023 | External Reviewers - SAFEBuilt | APPROVED | Activity Number: TC-COM-1122-00121 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Approved Open Item from the previous review addressed satisfactorily. BUILDING REVIEW COMMENTS: Approved MECHANICAL REVIEW COMMENTS: Conditionally Approved Approved/subject to field approval ELECTRICAL REVIEW COMMENTS Conditionally Approved E100 POWER PLAN: Duplicate Sheet Note #22 with conflicting directions. Correct or combine as required. Sheet Note #9 is used. E102 LIGHTING PLAN ELECTRICAL: Could not locate Sheet Notes 4 and 7. E601 ELECTRICAL PANEL SCHEDULES: May want to upsize CB/conductor for oven tag #20032. PLUMBING REVIEW COMMENTS: Conditionally Approved Third Plumbing Review: = OK Subject To Field Inspections 1). OK 2). OK 3). OK - Lavatory Faucet hot water & required ASSE 1070 mixing valve installation subject to field inspections. -IPC 607.1, 419.5 4). OK 5). OK 6). OK 7). OK 8). Per Comment response Water heater combustion air deriving from room volume= Subject to field inspections 9). OK 10). OK If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
||
04/19/2023 | Site Engineering | APPROVED | |||
04/21/2023 | Site Zoning | APPROVED | |||
04/22/2023 | Bldg Permits - Post Review | REVIEW COMPLETED | |||
03/28/2023 | PDSD Application Completeness | REVIEW COMPLETED |