Permit Number: TC-COM-1122-00044
Parcel: 141185990

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.2

Permit Number - TC-COM-1122-00044
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
09/05/2024 Bldg Permits - Post Review Express PENDING ASSIGNMENT
08/28/2024 External Reviewers - Stantec REQUIRES RESUBMIT August 26, 2024
2nd Review

Centennial American Properties
Attn: Jason Tankersley
1200 East Morehead, Suite 280
Charlotte, North Carolina 28204

Re: CAP STORAGE – OLD VAIL
NEW BUILDING (REVISIONS)

City of Tucson Permit Number: TC-COM-1122-00044
Stantec Project Number: 185215066
Stantec File Number: TUC-24-096

Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken.

The scope of this review covers the architectural, structural, plumbing, mechanical, and electrical designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval.

Occupancy
Group Construction
Type Area
(Square feet) Occupant
Load Automatic
Fire Sprinklers Fire
Alarms
S-1 II-B 105,504 240 Yes No
Separate Permits: Automatic fire sprinklers and signage.
Deferred Submittals: Metal stairs, storefront and window system, elevator shop drawings, prefabricated canopy
Special Inspections: Earthwork, concrete, epoxy and expansion anchors, structural steel, high-strength bolts, field welding, and masonry.

ARCHITECTURAL COMMENTS

Sheet A001

1. Addressed.

2. Addressed.

3. Addressed.
Sheet A002

1. New Comment: This revised sheet now indicates that the thru-wall penetration fire stopping and head wall joint systems to be detailed in a separate permit. Please revise this to indicate as a deferred submittal and include with the deferred submittals on the cover page.

Sheet A100

1. Addressed.

2. Addressed.

Sheet A102.1

1. Addressed.

Sheet A122

1. Addressed.

Sheet A131

1. Previous Comment: Please provide a detail and listed assembly for the 1-hour floor construction indicated. [Ref. IBC 2018 Sec. 703.3] New Comment: The revised plans do call-out a UL assembly but a detail for the construction of the proposed assembly was not provided in the plan-set. Please provide.

Sheet A500

1. Addressed.

Sheet A920

1. Addressed.

STRUCTURAL COMMENTS

General

1. Addressed.

2. Addressed.


Sheet S120

1. Addressed.

Sheet S501

1. Addressed.

MECHANICAL COMMENTS

There are no comments.

PLUMBING COMMENTS

Sheet P101

1. Previous Comment: The plan indicates that the building drain connection to the oil/water separator is included with the civil plan. The civil plan provided does not include the oil/water separator. Please coordinate and revise. New Comment: The civil drawings provided do indicate the location of the oil/water separator but refer to the plumbing drawings for details and specifications. Please provide plumbing plans with details and specifications for the oil/water separator. [Ref. IPC 2018 Sec. 1003.4.2]

ELECTRICAL COMMENTS

General

1. Addressed.

2. Addressed.

3. Addressed.


Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline.

Plans reviewed by:
Trevor Bies,
Senior Plan Reviewer
602-338-9922
trevor.bies@stantec.com
09/05/2024 Fire New Construction REVIEW COMPLETED
08/16/2024 PDSD Application Completeness Express REVIEW COMPLETED