Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1122-00019
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/20/2022 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
12/20/2022 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Activity Number: TC-COM-1122-00019 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: DENIED Provide following for a complete Structural review: 1. Provide design drawings that are marked "good for construction" and not "preliminary only". 2. Structural drawings need to be stamped and signed by a state licensed professional engineer. 3. Provide a copy of the Structural Analysis/ Calculations of the Structural design. 4. Please confirm that the Shade Sail framing and its associated foundations are not part of this review. BUILDING REVIEW COMMENTS: DENIED LABEL THE USE OF THE BUILDING. DETAIL THE OCCUPANT LOAD BASED ON THE USE GROUP OF THE SPACES AND TABLE 1004.5. SHOW THE AREA CALCULATIONS OF THE BUILDING, STAGE PLATFORM, AND MEMBRANE COVERED AREA. THE BUILDING IS MISSING THE EMERGENCY LIGHTING AND EXTERIOR LIGHTS AT THE EXIT DOORS. THERE ARE NO TOILET ROOMS SHOWN. NEED THE COMCHECK FOR LIGHTING, AND THERMAL ENVELOPE IF CONDITIONED SPACE MECHANICAL REVIEW COMMENTS: CONDITIONALLY APPROVED Approved/subject to field approval ELECTRICAL REVIEW COMMENTS CONDITIONALLY APPROVED E101: Should have called out feeder depth and conduit type. Permit approved, but Electrical contractor at risk if feeder is not installed per NEC requirements. PLUMBING REVIEW COMMENTS: DENIED First Plumbing Review: 1). need to address the BLDG plan review Use & occupancy comments. -IPC 403.1 2). Plan page A151 needs to show scupper sizes & square footage load to each .IPC 1106.1, 1108 3). Plan Page A151 needs to show secondary scupper locations. -IPC 1108 4). Plumbing plans Architectural plan don't illustrate the required plumbing fixtures & piping arrangements. -IPC 106.3.1, 403.1, 602, 301.3 701.2 5). Within the site plans it shows this project being a shell building & stage? There is not a work scope shown on plan page G001 -IPC 106.3.1 6). If this is a shell Building and a stage, plans need to include the accessible path & distance from stage to the required plumbing fixtures. -IPC 403.3.1, 403.3.3, 403.5 If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
||
11/28/2022 | Site Engineering | REQUIRES RESUBMIT | See Zoning Comment | ||
11/09/2022 | Site Zoning | REQUIRES RESUBMIT | FROM: Paul Camarena PDSD Zoning Review Section PROJECT: TC-COM-1122-00019 5301 E GRANT RD Zoning PAD-16 TRANSMITTAL DATE:‎November 9, 2022 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1. Zoning has reviewed the building plans for compliance with DP22-0230 and although it appears that the building plans match the DP, Zoning cannot approve the building plan until the DP is approved. 2. The development package sheets provided in the building plan set, either need to be the approved stamped development package sheets, marked for reference only or removed from the building plans If you have any questions about this transmittal, Contact Paul Camarena at (520)837-4986 or by email Paul.Camarena@tucsonaz.gov |
||
12/13/2022 | Fire New Construction | REVIEW COMPLETED | |||
11/05/2022 | PDSD Application Completeness Express | REVIEW COMPLETED |