Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1122-00016
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/08/2022 | Site Zoning | APPROVED | |||
11/28/2022 | Site Engineering | NOT REQUIRED | |||
12/16/2022 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
12/16/2022 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Activity Number: TC-COM-1122-00016 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: APPROVED BUILDING REVIEW COMMENTS: DENIED 1. Sheet G100: Provide a narrative on the processes and the items being manufactured. Additionally, provide information stored in the H-2 use. Ensure all requirements of Section 415 have been reviewed. 2. Sheet A102: Provide the location of all exit signage and egress illumination in accordance with Section 1008 and 1013. 3. Sheet A701: UL fire resistance rated assemblies typically are comprised of proprietary materials to achieve a complete assembly. Revise the entire assembly (UL U419) on this sheet to reflect the current assembly listed by UL. The current UL listed assembly is dated September 5, 2022. MECHANICAL REVIEW COMMENTS: CONDITIONALLY APPROVED Approved/subject to field approval ELECTRICAL REVIEW COMMENTS APPROVED PLUMBING REVIEW COMMENTS: CONDITIONALLY APPROVED First Plumbing Review: Ok Subject to field inspections If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
||
12/12/2022 | Fire New Construction | REQUIRES RESUBMIT | Comment: You shall provide a written narrative letter of the operations in every area of the building all throughout and storage quantities in the H. Provide a full Hazardous Material Inventory Statement (HMIS) Per IFC 2018, Chapter 50, Section 5001.5.2. Provide MSDS and all quantities of chemicals being used throughout the buildings and define the operations in those areas. Provide a Hazardous Material Management plan per the IFC 2018, Chapter 50 Section 5001.5.1 Questions: Jennifer Peel-Davis Tucson Fire Department Fire Plans Examiner Fire Inspector I, II and Fire Alarm Plans Examiner Jennifer.Peel-Davis@Tucsonaz.gov Desk: 520-837-7033 |
||
11/05/2022 | PDSD Application Completeness | REVIEW COMPLETED |