Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Review Status: Requires Resubmit

Review Details: COMMERCIAL PDSD SIMPLE REVIEW v.1

Permit Number - TC-COM-1026-01771
Review Name: COMMERCIAL PDSD SIMPLE REVIEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
10/28/2026 Bldg Permits - Post Review Express PENDING ASSIGNMENT
10/28/2026 Commercial Electrical Express REQUIRES RESUBMIT Commercial Electrical Review TC-COM-1026-01771 (5025 N 1ST AV Unit:BLDG 9 UNIT 903 TUCSON, AZ 85718)
Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received.
Code reference, 2024 International Building Code (IBC), 2023 National Electrical Code (NEC), 2012 Outdoor Lighting Code (OLC).
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/building-code/2012_outdoor_lighting_code_.pdf

Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov

1. Provide updated electrical for the replacement of the HVAC system. Provide GFCI protection for outdoor electrical outlet supplying the HVAC unit, NEC 210.8(F). If equipment supplied by an outlet covered under the requirements of this section is replaced, the outlet shall be supplied with GFCI protection.
10/28/2026 Commercial Mechanical Express REQUIRES RESUBMIT Replacement of a commercial AC unit constitutes new work so the submittal will require the specifications of the replacement unit along with a heating/cooling load calculation to justify the capacity of the unit being installed (Section C403.3.1, IECC 2024). The unit itself will also have to comply with Sections C403.2.2, C403.3.2, C403.4 and C403.5, IECC 2024 for efficiency, controls, and economizers. While ventilation calculations are not required, a test and balance report is required to verify that the total supply airflow and the outside airflow are at least equal to that which the previous AC unit provided. Reference: Section C503.3, IECC 2024.

If you have any questions about this review comment, I can be reached at Robert.Sherry@tucsonaz.gov.
10/28/2026 PDSD Application Completeness Express REVIEW COMPLETED The address on the plan and the address applied for do not match. Please contact Pima County Addressing to verify the full address. The address on the application and the address on the plans must match. Once this is complete then resubmit the matching plans. If you have questions please email cdrc@tucsonaz.gov