Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1026-01770
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/02/2026 | Commercial Electrical Standard | APPROVED | |||
| 11/02/2026 | Commercial Mechanical Standard | APPROVED | |||
| 11/02/2026 | Commercial Plumbing Standard | APPROVED | |||
| 10/30/2026 | Site Zoning Standard | APPROVED | |||
| 11/02/2026 | Water - PDSD Standard | APPROVED | |||
| 11/02/2026 | Outdoor Lighting Standard | NOT REQUIRED | No modifications to the outdoor lighting. | ||
| 10/30/2026 | Site Engineering Standard | NOT REQUIRED | TI Only | ||
| 11/04/2026 | Commercial Post Review Express | PENDING ASSIGNMENT | |||
| 11/03/2026 | Commercial Building Standard | REQUIRES RESUBMIT | Please submit a complete set of revised/corrected documents and a written response addressing each review comment and explaining how it was resolved. The original submittal was incomplete, and additional comments may be issued upon subsequent review. Please email me with any questions regarding the comments below. mark.masek@tucsonaz.gov 1. Please verify that all sheets display correctly, unused viewports are turned off, and no unintended layers or drawing elements appear in the final PDF set. 2. Please obtain an official suite address from Pima County Addressing before the next submittal. Include the assigned suite number on the cover sheet and in the title block on all drawings. 3. Please place these notes on the cover sheet with the name of the Registered Design Professional named and include contact information. A. PER IBC Section 107.3.4 <Name of Registrant>, the registered design professional in charge shall be responsible for reviewing and coordinating submittal documents prepared by others, including phased and deferred submittal items, for compatibility with the design of the building. B. PER IBC Section 107.3.4.1 Submittal documents for deferred submittal items shall be submitted to the registered design professional in responsible charge, who shall review them and forward them to the Building Official with a notation indicating that the deferred submittal documents have been reviewed and that they have been found to be in general conformance with the design of the building. 4. Sheet A0.0: Please verify and amend the project location pointer to read 2700 E. Commerce Center Place on the Property Map or revise the address of this permit, as the current pointer appears to indicate a portion of 2700 E. Commerce Center Place. 5. Please see TC-COM-1124-02270 in https://pro.tucsonaz.gov/ to see the Suite 150 floor plan for a reference. 6.Sheet A0: Please provide the total square footage and total design load for this new suite. IBC 107.2.1, 7. Sheet A0.1: Please provide an exit and egress plan for the new suite only, in accordance with 2024 IBC Section 107.2.1. Dimension the total exit access travel distance on the plan, clearly identifying the starting and ending points. Show the maximum exit access travel distance from each cleanroom area to the applicable exit. For Group F-1 occupancy, identify the applicable maximum allowable travel distance of 250 feet in accordance with IBC Section 1017.2.8. Sheet A0.1: Please show Exit signs on the Exit Egress plan and ensure they are consistent with the electrical lighting plans so all plans match. IBC 107.2.1 Please contact me if you have any questions about the above comments. Mark Masek Plans Examiner – Building Safety Planning and Development Services | City of Tucson main 520.837.4994 email mark.masek@tucsonaz.gov |
||
| 11/04/2026 | Fire New Construction Standard | REQUIRES RESUBMIT | Resolve building review comments. Questions: patricia.shelton@tucsonaz.gov |
||
| 10/29/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |