Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1026-01725
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/17/2026 | Commercial Mechanical Standard | APPROVED | |||
| 11/17/2026 | Commercial Plumbing Standard | APPROVED | |||
| 11/12/2026 | Site Zoning Standard | APPROVED | |||
| 11/17/2026 | Water - PDSD Standard | APPROVED | |||
| 11/09/2026 | Outdoor Lighting Standard | NOT REQUIRED | No modifications to the outdoor lighting. | ||
| 10/26/2026 | Site Engineering Standard | NOT REQUIRED | |||
| 11/17/2026 | Commercial Post Review Express | PENDING ASSIGNMENT | |||
| 11/16/2026 | Commercial Building Standard | REQUIRES RESUBMIT | Please email me with any questions regarding the comments below: mark.masek@tucsonaz.gov 1. Please amend the sheet index or the plan set configuration, to accurately reflect all sheets included within the scope of this permit. For example, Sheets E0.02 & E6.00 ares listed in the sheet index but is not included in the submitted plan set. All sheets shall be consistently identified and coordinated throughout the construction documents. IBC Section 107.2.1. 2. Please amend plans to show how the accessibility elements have been upgraded. IEBC 306.7.1 requires that accessibility be provided to the altered spaces. Where the existing path of travel elements, which entails a primary entrance, a primary path of travel, sanitary facilities serving the area, a drinking fountain, and signs. If these items are not fully compliant, upgrades shall be required in accordance with IEBC.306.7.1. For example, the existing restrooms do not appear to be fully accessible with the required 5' foot clear floor space next to the water closet. Additionally, the doors to the restrooms do not seem to have the required maneuvering clearances. 2017 ICC A117.1 Sections 404.2.3 & 604.3.1 A. If the cost of providing or upgrading the items above to be accessible is disproportionate to the cost of construction (exceeds 20% of the cost of construction not including accessibility upgrades), please provide information to verify construction costs. If this exemption is taken, accessibility upgrades equaling 20% of the cost of the project shall be made, or the space is fully accessible, whichever is less. Please contact me if you have any questions about the above comments. Mark Masek Plans Examiner – Building Safety Planning and Development Services | City of Tucson main 520.837.4994 email mark.masek@tucsonaz.gov |
||
| 11/09/2026 | Commercial Electrical Standard | REQUIRES RESUBMIT | Commercial Electrical Review TC-COM-1026-01725 (6245 E BROADWAY BL Unit:UNIT 300 TUCSON, AZ 85711) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2024 International Building Code (IBC), 2023 National Electrical Code (NEC), 2012 Outdoor Lighting Code (OLC). https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/building-code/2012_outdoor_lighting_code_.pdf Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov 1. Provide updated electrical panel schedules for the new/modified electrical panels and designate the circuit number on the electrical plans, that corresponds to the panel schedule, at the location of each, new or modified light fixture, receptacle, and equipment disconnect switch, NEC arts;300 and 408.4. IBC 107.1. 2. Show electrical outlets, panels and other penetrations within fire-rated walls, floors and ceilings with fire ratings. IBC 714. Provide appropriate details as necessary for all electrical penetrations in a fire-rate wall. Include manufacturer’s installation instruction for any fire rated products used. |
||
| 11/13/2026 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 10/23/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |