Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-1025-02002
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/04/2025 | Commercial Electrical Standard | APPROVED | |||
| 11/24/2025 | Commercial Mechanical Standard | APPROVED | |||
| 11/24/2025 | Commercial Plumbing Standard | APPROVED | |||
| 11/04/2025 | Outdoor Lighting Standard | APPROVED | |||
| 11/20/2025 | Site Zoning Standard | APPROVED | |||
| 11/24/2025 | Water - PDSD Standard | APPROVED | |||
| 11/04/2025 | Site Engineering Standard | NOT REQUIRED | |||
| 11/24/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 11/21/2025 | Commercial Building Standard | REQUIRES RESUBMIT | Please submit your revised documents and provide a letter with a written response letter addressing each of the comments indicating how the Review comments were resolved. 1. Please provide plans sealed by an Arizona Registrant, and please remove the FOR REVIEW ONLY statement in the Title Block. Reference: Section 107.1, IBC 2018 and Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304. 2. Please provide a detailed wall section for each wall type used to include, but not be limited to: A. Studs: Provide the gauge (base-steel thickness) and yield strength, spacing of the C-shaped steel studs. B. Floor and roof connections: Detail the connection between the top track and the roof or floor framing above, including any required clips for deflection. C. Foundation connection: Show the connection of the bottom track to the foundation or floor slab. D. Corner and intersection details: Illustrate how studs are framed and connected at corners and wall intersections. E. Show the wall finishes, insulation, and sound attenuation if used Please contact me if you have any questions about these comments. Mark Masek Plans Examiner – Building Safety Planning and Development Services | City of Tucson main 520.837.4994 email mark.masek@tucsonaz.gov |
||
| 11/24/2025 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 11/03/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |