Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL REVISION v.1
Permit Number - TC-COM-1025-01884
Review Name: COMMERCIAL REVIEW - FULL REVISION v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/04/2026 | Commercial Building Standard | APPROVED | |||
| 04/27/2026 | Commercial Electrical Standard | APPROVED | |||
| 04/14/2026 | Site Engineering Standard | APPROVED | |||
| 04/27/2026 | Site Zoning Standard | APPROVED | |||
| 04/30/2026 | Water - PDSD Standard | APPROVED | |||
| 04/30/2026 | Commercial Plumbing Standard | NOT REQUIRED | |||
| 04/27/2026 | Outdoor Lighting Standard | NOT REQUIRED | No changes from the previously approved outdoor lighting. | ||
| 05/04/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 04/30/2026 | Commercial Mechanical Standard | REQUIRES RESUBMIT | 1. Provide the specifications for the new HVAC units (e.g. manufacturer, model number, heating/cooling capacity, and efficiency ratings). All single-phase heat pumps not operational on January 1, 2023, in the Southwest region, must have an EnergyGuide label identifying a minimum 14.3 SEER2 rating and a 7.5 HSPF2 rating. Reference: Section 301.7, IMC 2018. 2. Show how the outside air will be supplied to the ventilated areas. Reference: Sections 401.2 and 401.3, IMC 2018. If you have any questions about this review comment, I can be reached at Robert.Sherry@tucsonaz.gov |
||
| 05/01/2026 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 04/10/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |