Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - LIMITED v.1
Permit Number - TC-COM-1025-01877
Review Name: COMMERCIAL REVIEW - LIMITED v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/28/2025 | Commercial Mechanical | NOT REQUIRED | |||
| 10/31/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 10/29/2025 | Commercial Building | REQUIRES RESUBMIT | Please submit your revised documents and provide a letter with a written response letter addressing each of the comments indicating how the Review comments were resolved. Additionally, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. 1. Please provide material strengths for the concrete and rebar to be used in this project. IBC 107.2.7 For example, Concrete 2500 psi Additionally provide the minimum depth of the concrete. Please contact me if you have any questions about these comments. Mark Masek Plans Examiner – Building Safety Planning and Development Services | City of Tucson main 520.837.4994 email mark.masek@tucsonaz.gov |
||
| 10/22/2025 | Commercial Electrical | REQUIRES RESUBMIT | Commercial Electrical Review TC-COM-1025-01877 (1305 S ALVERNON WY TUCSON, AZ 85711) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC). 1. Clarify the Overcurrent Protection provided for the new Panel D1. Reference sheet E801, Switchboard HCP Circuit #4. This circuit shows the new Panel D1 with a 20A Overcurrent Protection Device, while the load calculations found with Panel D1 show an estimated load of 29A. 2. Provide more detail as to how the New panel D1 is protected from possible vehicle damage. Ref; NEC 300.4 Protection Against Physical Damage, NEC110.27(B) Prevent Physical Damage Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov |
||
| 10/28/2025 | Commercial Plumbing | REQUIRES RESUBMIT | ACTIVITY NO. TC-COM-1025-01877 ADDRESS/PARCEL: (1305 S ALVERNON WY TUCSON, AZ 85711) The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. COMMENTS: 1. Yard hydrant detail does not show any backflow protection. All potable water openings and outlets shall be protected against backflow. Reference: IPC 2018, Section 608.16. 2. Show the capacity of the existing interceptor the trench drain is connecting to. The capacity must meet the requirements of IPC 2018, Section 1003.4.2.2. 3. Provide identification of all non-potable water piping. Reference: IPC 2018, Section 608.9. |
||
| 10/22/2025 | Outdoor Lighting | REQUIRES RESUBMIT | Outdoor Lighting Review TC-COM-1025-01877 (1305 S ALVERNON WY TUCSON, AZ 85711) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC), 2012 Outdoor Lighting Code (OLC). Outdoor Lighting Review: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/building-code/2012_outdoor_lighting_code_.pdf 1. Provide an outdoor site lighting plan that meets the requirements of OLC 104.2. Show/locate the different light sources on your site plan. Number the light fixtures on your lighting fixture table and use the same number on your site plan. 2. List the Lighting Area per OLC (Typically E3) chapter 3 and used in Table 401.1. Specify the compliance option from Table 401.1 that is being used. Total outdoor light output shall not exceed the lumen limits listed in Table 401.1. 3. Show compliance with City of Tucson Outdoor Lighting Code with an approved lighting calculation in accordance with OLC 104.2.1, 401.2. Include all exterior fixtures on the property in the calculations. List shielded and unshielded lights in the calculation. 4. Show unshielded fixtures with a maximum of 3,000 lumens, OLC 401.4. 5. Show lamps with a maximum of 3500K color temperature, OLC 402.1. 6. Indicate whether or not a special inspection is required per sec. 104.2.2, and 106.2. https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/planning-development-services/documents/special_inspection_certificate_odl.pdf 7. Specify any exceptions used. 8. Provide Curfew lighting controls If applicable Per section 403. Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov |
||
| 10/31/2025 | Site Engineering | REQUIRES RESUBMIT | Permit: TC-COM-1025-01877 Location: 1305 S ALVERNON WY Review Date: 10/31/2025 Site Engineering Comments: 1. This site resides within X-Shaded XS-100year floodplain with average depths of less than 1 foot. 2. Because of the floodplain status, it will be required that a floodplain use permit be submitted within the sub-records of the commercial permit. 3. For the submission of the floodplain use permit (FPU), please provide the site plans for the project. 4. If the core structure/canopy is to remain open air with no enclosed walls, then this will only be treated as work within a floodplain. 5. Site Engineering is unable to review and approve permit TC-COM-1025-01877 until the associated Development Package TD-DEV-1025-00255 and floodplain use permit are reviewed and approved by all reviewers. If you have any questions or concerns, please contact Marco Contreras Marco.contreras@tucsonaz.gov |
||
| 10/30/2025 | Site Zoning | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: Bobby Parsons Zoning Section Review PROJECT: TC-COM-1025-01877 1305 S. Alvernon Wy. Tucson, AZ 85711 Convert existing parking to exterior car wash station, not for public use (1st Review) TRANSMITTAL DATE: 10/30/2025 This site is located in the C-2 zone (UDC 4.7.21). Automotive: Major Service & Repair is a permitted use in the zone (UDC Table 4.8-4) subject to Use Specific Standard 4.9.13.E. Comments: Please resubmit revised drawings along with a detailed response letter which states how all Zoning Review Section comments were addressed. 1. Comment: Zoning has reviewed the building permit for compliance with Development Package (DP) TD-DEV-1025-00255, and although it appears that the building plan is in compliance, until the DP is approved by all review agencies zoning cannot approve this permit. 2. Comment: This property is still zoned C-2 not C-3 as listed on Sheet 2. Please update accordingly as the rezoning has not been effectuated. 3. Comment: Additional comments may be forthcoming depending on responses to zoning review comments and plans submitted. If you have any questions about this transmittal, please contact Bobby Parsons at Robert.Parsons@tucsonaz.gov. |
||
| 10/28/2025 | Water - PDSD | REQUIRES RESUBMIT | ACTIVITY NO. TC-COM-1025-01877 ADDRESS/PARCEL: (1305 S ALVERNON WY TUCSON, AZ 85711) The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. COMMENTS: 1. Please provide the water meter size and the total water demand to verify that it can accommodate the proposed car wash station. Reference: IBC 2018, Section 107.2.1. |
||
| 10/27/2025 | Fire New Construction | REVIEW COMPLETED | |||
| 10/14/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |