Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - LIMITED v.1
Permit Number - TC-COM-1025-01821
Review Name: COMMERCIAL REVIEW - LIMITED v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/14/2025 | Commercial Electrical | APPROVED | |||
| 10/24/2025 | Site Zoning | APPROVED | |||
| 10/24/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 10/22/2025 | Commercial Building | REQUIRES RESUBMIT | Please amend plans to provide the weight of existing RTU to be removed and a comparison to the new RTU’s weight. If the new RTU weighs less than the existing, removed RTU all is good. However, if this is a new RTU or a replacement that is heavier than the removed unit, provide an engineering evaluation from an Arizona registered engineer to indicate the existing roof structure can support the new RTU to include calculations, plans/details for the support of such equipment. IBC 107.2 Please contact me if you have any questions about these comments. Mark Masek Plans Examiner – Building Safety Planning and Development Services | City of Tucson main 520.837.4994 email mark.masek@tucsonaz.gov All documents to be prepared, sealed, signed, and dated by a registered design professional. Reference: Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304, 2018 IBC section 107.1, City of Tucson Commercial Plan Submittal Requirements. https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/checklists/commercial_submittal_requirements_july2023.pdf |
||
| 10/22/2025 | Commercial Mechanical | REQUIRES RESUBMIT | ACTIVITY NO. TC-COM-1025-01821 ADDRESS/PARCEL: (9121 E TANQUE VERDE RD Unit:UNIT 105 TUCSON, AZ 85749) 1. Replacement of commercial AC units constitutes new work so the submittal will require a heating/cooling load calculation for the building to justify the capacities of the units being installed (Sections C403.3.1 and C403.2.2, IECC 2018). The units themselves will also have to comply with Sections C403.3.2, C403.4 and C403.5, IECC 2018 for efficiency, controls, and economizers. While ventilation calculations are not required, a test and balance report is required to verify that the total supply airflow and the outside airflow are at least equal to that which the previous AC unit provided. Reference: Section C503.4, IECC 2018. |
||
| 10/20/2025 | Fire New Construction | REVIEW COMPLETED | |||
| 10/08/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |