Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1025-01795
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/31/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 10/24/2025 | Commercial Building Standard | REQUIRES RESUBMIT | Please submit your revised documents and provide a letter with a written response letter addressing each of the comments indicating how the Review comments were resolved. Additionally, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please note the submittal was incomplete and the plan review was conducted using the information presented. The subsequent review could generate more comments after original comments have been addressed. 1. Provide design, calculations and construction plans for all building structures sealed by an Arizona Registrant that adequately show the scope of work for this address and how the work complies with the adopted building codes. Reference: Section 107.1, IBC 2018 and Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304. Provide foundation and connection details, etc 2. Please review the City of Tucson Commercial Submittal requirements and provide construction documents accordingly. IBC 107.2.1 Link https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/checklists/commercial_submittal_requirements_july2023.pdf 3. Please apply for a separate building permit for each separate structure and Identify each structure with a unique label. IBC 107.2.1 For example, Storage Container A, B, C, ect. 4. Please contact Doris Benoit at doris.benoit@tucsonaz.gov or by phone at 520.887.4902 for information on processing Master plan permits. We are using this process as we have more than one structure using the same construction documents for all. Please contact me if you have any questions about these comments. Mark Masek Plans Examiner – Building Safety Planning and Development Services | City of Tucson main 520.837.4994 email mark.masek@tucsonaz.gov |
||
| 10/16/2025 | Commercial Electrical Standard | REQUIRES RESUBMIT | Commercial Electrical Review TC-COM-1025-01795 (6444 S FONTANA AV TUCSON, AZ 85706) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC). Electrical Review: 1. This is a commercial project, requiring all documents to be prepared, sealed, signed, and dated by a registered design professional. Provide complete electrical plans, design, and calculations, sealed by an Arizona Registrant. Reference: Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304, 2018 IBC section 107.1, 2017 NEC, City of Tucson Commercial Plan Submittal Requirements. https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/checklists/commercial_submittal_requirements_july2023.pdf 2. Solar Photovoltaic systems shall comply with NEC 690. 3. Energy storage systems shall comply with NEC 706. 4. Stand-alone systems shall comply with NEC 710. 5. Full and complete electrical plans are required showing where all the loads for each load center are going. Locations, wiring methods, conduit sizes, etc. Additional comments will be forthcoming with complete and sealed plans provided by an Arizona Registered Electrical Engineer. Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov |
||
| 10/16/2025 | Outdoor Lighting Standard | REQUIRES RESUBMIT | Outdoor Lighting Review TC-COM-1025-01795 (6444 S FONTANA AV TUCSON, AZ 85706) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC), 2012 Outdoor Lighting Code (OLC). 1. This is a commercial project, requiring all documents to be prepared, sealed, signed, and dated by a registered design professional. Provide complete electrical plans, design, and calculations, sealed by an Arizona Registrant. Reference: Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304, 2018 IBC section 107.1, 2017 NEC, City of Tucson Commercial Plan Submittal Requirements. https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/checklists/commercial_submittal_requirements_july2023.pdf Outdoor Lighting Review: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/building-code/2012_outdoor_lighting_code_.pdf 1. Provide an outdoor site lighting plan that meets the requirements of OLC 104.2. Show/locate the different light sources on your site plan. Number the light fixtures on your lighting fixture table and use the same number on your site plan. 2. List the Lighting Area per OLC (Typically E3) chapter 3 and used in Table 401.1. Specify the compliance option from Table 401.1 that is being used. Total outdoor light output shall not exceed the lumen limits listed in Table 401.1. 3. Show compliance with City of Tucson Outdoor Lighting Code with an approved lighting calculation in accordance with OLC 104.2.1, 401.2. Include all exterior fixtures on the property in the calculations. List shielded and unshielded lights in the calculation. 4. Show unshielded fixtures with a maximum of 3,000 lumens, OLC 401.4. 5. Show lamps with a maximum of 3500K color temperature, OLC 402.1. 6. Indicate whether or not a special inspection is required per sec. 104.2.2, and 106.2. https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/planning-development-services/documents/special_inspection_certificate_odl.pdf 7. Specify any exceptions used. 8. Provide Curfew lighting controls If applicable Per section 403. Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov |
||
| 10/31/2025 | Site Engineering Standard | REQUIRES RESUBMIT | Permit: TC-COM-1025-01795 Location: 6444 S FONTANA AV Review Date: 10/31/2025 Site Engineering Comments: 1. Site Engineering is unable to approve permit TC-COM-1025-01795 until the associated Development Package TD-DEV-0525-00143 is reviewed and approved by all reviewers. If you have any questions or concerns, please contact Marco Contreras Marco.contreras@tucsonaz.gov |
||
| 10/28/2025 | Site Zoning Standard | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: Bobby Parsons Zoning Section Review PROJECT: TC-COM-1025-01795 – TD-DEV-0525-00143 6444 S. Fontana Ave. Tucson, AZ 85706 – C-2 Hybrid self-storage facility (1st Review) TRANSMITTAL DATE: 10/28/2025 This site is located in the C-2 zone (UDC 4.7.21). Personal Storage is an allowed use subject to Use Specific Standards 4.9.10.C.3 & .6. Comments: Please resubmit revised drawings along with a detailed response letter which states how all Zoning Review Section comments were addressed. 1. Comment: Zoning has reviewed the plans for compliance with the associated Development Package (DP) TD-DEV-0525-00143. Until the DP is approved by all review agencies, Site Zoning cannot approve this permit. 2. Comment: Ensure the site plan submitted for the building permit matches what is shown on the Development Package (IE: PAAL’s consistently dimensioned, heights match, etc.) 3. Comment: Additional comments may be forthcoming on the next review based on the plans submitted and responses to zoning review comments. If you have any questions about this transmittal, please contact Bobby Parsons at Robert.Parsons@tucsonaz.gov. |
||
| 10/23/2025 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 10/03/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |