Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL REVISION v.1
Permit Number - TC-COM-1025-01789
Review Name: COMMERCIAL REVIEW - FULL REVISION v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/26/2026 | Commercial Building Standard | APPROVED | |||
| 08/24/2026 | Outdoor Lighting Standard | APPROVED | |||
| 08/07/2026 | Site Engineering Standard | APPROVED | |||
| 08/20/2026 | Site Zoning Standard | NOT REQUIRED | |||
| 08/26/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 08/24/2026 | Commercial Electrical Standard | REQUIRES RESUBMIT | Commercial Electrical Review TC-COM-1025-01789 (3232 E SPEEDWAY BL TUCSON, AZ 85716) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2024 International Building Code (IBC), 2023 National Electrical Code (NEC), 2012 Outdoor Lighting Code (OLC). https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/building-code/2012_outdoor_lighting_code_.pdf Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov 1. Due to the change in interconnection points to multiple metered systems, each system will be required to have its own separate permit. This existing permit may continue for the existing address/(meter associated with this address), structure and PV installations. This permit, TC-COM-1025-01789, can be used as the Master permit and hold the combined building plans for each new permit. 2. The general sheets of the building plans, such as T001, A100, A200, E001, should contain each address, not just 3232 E Speedway BL. 3. Please file 5 new solar permits for the other addressed meters that are being connected to the PV systems. Note in the description of each new solar permit that the Master permit is TC-COM-1025-01789. Electrical Review 4. Reference Sheet 201. 203. 204 & 206. Interconnection method is not a Supply Side interconnection per NEC 705.12(A). Show the correct Load Side interconnection per NEC 705.12(B). 5. Provide for local disconnecting means at the structure for the canopy lighting as required per NEC art 225.31-32. |
||
| 08/17/2026 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 08/06/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |