Permit Number: TC-COM-1025-01789
Parcel: 12513002F

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL REVISION v.1

Permit Number - TC-COM-1025-01789
Review Name: COMMERCIAL REVIEW - FULL REVISION v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
08/26/2026 Commercial Building Standard APPROVED
08/24/2026 Outdoor Lighting Standard APPROVED
08/07/2026 Site Engineering Standard APPROVED
08/20/2026 Site Zoning Standard NOT REQUIRED
08/26/2026 Bldg Permits - Post Review Express PENDING ASSIGNMENT
08/24/2026 Commercial Electrical Standard REQUIRES RESUBMIT Commercial Electrical Review TC-COM-1025-01789 (3232 E SPEEDWAY BL TUCSON, AZ 85716)
Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received.
Code reference, 2024 International Building Code (IBC), 2023 National Electrical Code (NEC), 2012 Outdoor Lighting Code (OLC).
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/building-code/2012_outdoor_lighting_code_.pdf

Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov

1. Due to the change in interconnection points to multiple metered systems, each system will be required to have its own separate permit. This existing permit may continue for the existing address/(meter associated with this address), structure and PV installations. This permit, TC-COM-1025-01789, can be used as the Master permit and hold the combined building plans for each new permit.
2. The general sheets of the building plans, such as T001, A100, A200, E001, should contain each address, not just 3232 E Speedway BL.
3. Please file 5 new solar permits for the other addressed meters that are being connected to the PV systems. Note in the description of each new solar permit that the Master permit is TC-COM-1025-01789.

Electrical Review
4. Reference Sheet 201. 203. 204 & 206. Interconnection method is not a Supply Side interconnection per NEC 705.12(A). Show the correct Load Side interconnection per NEC 705.12(B).
5. Provide for local disconnecting means at the structure for the canopy lighting as required per NEC art 225.31-32.
08/17/2026 Fire New Construction Standard REVIEW COMPLETED
08/06/2026 PDSD Application Completeness Express REVIEW COMPLETED