Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1024-02059
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/06/2024 | Site Zoning | APPROVED | |||
11/21/2024 | Water - PDSD | APPROVED | |||
12/06/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
11/15/2024 | Commercial Electrical | REQUIRES RESUBMIT | |||
11/15/2024 | Commercial Mechanical | REQUIRES RESUBMIT | For questions in regards to plan review comments, please contact Bill McClellan by email at bmcclellan@willdan.com or cell (928)580-3179. All applicable comments followed by the initials (BM) | ||
11/15/2024 | Commercial Plumbing | REQUIRES RESUBMIT | |||
11/15/2024 | Commercial Structural | REQUIRES RESUBMIT | 1. Sheet A105 Clarify Exterior CMU wall adjacent to retaining wall and identified to be 3' from property line on sheet A101 should be identified as a rated wall for less than 5' to property line. 2018 IBC table 602. Clarify if existing building had a rated wall (BM) [ Ver. 4 ] [Edited By Bill McClellan] 2. Sheet S102 Masonry lintel schedule (ML_) has different lintel depths than identified in calculations. Also an additional lintel (MaL-4) is identified in calculatios. Calculations identify MaL-1 = 32", MaL-3 = 24", MaL-4 = 16". MaL-2 is 24" as per schedule. Clarify on plans. 2018 IBC 107.2.1 (BM) [ Ver. 2 ] [Edited By Bill McClellan] |
||
11/22/2024 | Site Engineering | REQUIRES RESUBMIT | 1. A development package is required and must be approved before this building permit can be approved. Include the civil sheets mentioned in the sheet index that were missing from this submittal. Mike Ortiz michael.ortiz@tucsonaz.gov |
||
10/28/2024 | Fire New Construction | REVIEW COMPLETED | |||
10/25/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |