Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-1024-02057
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/10/2025 | Site Zoning | APPROVED | |||
| 01/10/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 12/19/2024 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Madeline Nelson mnelson@safebuilt.com Approved Reason: Date Completed : 12/18/2024 6:52:01 PM Building(B) Reviewer (from previous submittal TUC9616001.102924) Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Approved Reason: Date Completed : 11/2/2024 1:42:22 AM Mechanical(M) Reviewer (from previous submittal TUC9616001.102924) Jorge Valido jvalido@safebuilt.com Approved Reason: Date Completed : 11/11/2024 1:18:07 PM Electrical(E) Reviewer Ron Ross rross@safebuilt.com Approved Reason: Date Completed : 12/16/2024 3:50:53 PM Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Denied Reason: Date Completed : 12/18/2024 8:32:34 PM Second Plumbing Review: No Response to original comments Unresolved- 1). Plan Pages P1 & P4: The 2" floor sink and 2" drain branch are undersized specifically at the 3 compartment sink. Upsize floor sink & drain branch to at least 3" to be able handle the load of all 3 sink bins being drained simultaneously without splashing or flooding per -2018 IPC 802.4.1 Unresolved-2). Plan Page P1: Grease waste exit at building needs a 2 way cleanout at building. Add building cleanout on grease line Per - 2018 IPC 708.1.3 |
||
| 12/23/2024 | Fire New Construction | REVIEW COMPLETED | Upgrade information Per 2024IFC table 1017.2. sal.erivez@tucsonaz.gov |