Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1024-01982
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/14/2024 | Commercial Electrical | APPROVED | |||
| 11/21/2024 | Site Engineering | APPROVED | |||
| 12/02/2024 | Site Zoning | APPROVED | |||
| 11/25/2024 | Historic | NOT REQUIRED | The project is outside HPZ. Located in the 4th Avenue National Historic District. Also it is an interior remodel. NO HPZ review required Contact Michael.Taku@tucsonaz.gov |
||
| 12/02/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 11/14/2024 | Commercial Mechanical | REQUIRES RESUBMIT | Sheet A1 For questions in regards to plan review comments, please contact Bill McClellan by email at bmcclellan@willdan.com or cell(928)580-3179. all applicable comments followed by the initials (BM) | ||
| 11/14/2024 | Commercial Plumbing | REQUIRES RESUBMIT | 1. Sheet P2 Provide for review, typical detail and notes for sediment trap at each appliance if not incorporated as part of the appliance to include location of trap to be downstream of the valve. 2018 IFGC 408.4 | ||
| 11/14/2024 | Commercial Structural | REQUIRES RESUBMIT | 1. Sheet A7 Provide complete wall section framing detail for new support walls to include floor anchoring and lateral bracing / connection to existing wall or structure. Incomplete. 2018 IBC 107.2.1 (BM) 2. Sheet A7 Typical Hood support detail per manufacture identifies a minimum of 4 support rods along each long side of hood and additional support rods for supply air plenum section. Clarify with manufacture for alternate support methods to comply with proposed design of three rods and clips to wall. 2018 IBC 107.2.1 (BM) [ Ver. 2 ] [Edited By Bill McClellan] 3. Sheet A6 Provide on plans ceiling framing detail or notes for new hood as applicable for new hood dimensions and support system. Not clear on plans. 2018 IBC 107.2.1 (BM) |
||
| 11/17/2024 | Fire New Construction | REVIEW COMPLETED | |||
| 10/21/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |