Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1023-02513
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/09/2023 | Site Zoning | APPROVED | |||
| 11/27/2023 | Site Engineering | NOT REQUIRED | |||
| 11/27/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 11/03/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 11/2/2023 5:12:46 PM See the building review comments. Building(B) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 11/2/2023 5:11:12 PM 1) General: Provide the structural details for the support of the kitchen hoods. (2018 IBC section 107) 2) Sheet A102 (Floor Plan): Show the occupancies of the adjacent spaces to determine if fire separation is required per 2018 IBC Table 508.4. 3) Sheet P0.1 (Plumbing Details): Include the make, model, and details of the faucets showing compliance with amended 2018 IPC sections 412.11, 419.6. 4) Sheet P4.0(Plumbing Details): Include the T&P piping from the water heaters in Detail 2. (2018 IPC section 504.6) 5) Sheet E2.1 (Electrical Drawings): Show the rooftop HVAC service receptacle is GFCI protected. (2017 NEC sections 210.8, 210.63) Mechanical(M) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 11/2/2023 5:12:17 PM See the building review comments Electrical(E) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 11/2/2023 5:11:53 PM See the building review comments Plumbing(P) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 11/2/2023 5:12:31 PM See the building review comments. |
||
| 11/22/2023 | Water - PDSD | REQUIRES RESUBMIT | A 1-1/4” water meter is not an option from Tucson Water. The choice is for either a 1” water meter (maximum 50 GPM demand) or a 1-1/2” water meter (maximum 100 GPM demand). | ||
| 11/20/2023 | Fire New Construction | REVIEW COMPLETED | |||
| 10/31/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |