Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-1023-02513
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
11/09/2023 Site Zoning APPROVED
11/27/2023 Site Engineering NOT REQUIRED
11/27/2023 Bldg Permits - Post Review Express PENDING ASSIGNMENT
11/03/2023 External Reviewers - SAFEBuilt REQUIRES RESUBMIT Structural(S) Reviewer
Keith Miller
kmiller@safebuilt.com
Denied
Reason:
Date Completed : 11/2/2023 5:12:46 PM
See the building review comments.




Building(B) Reviewer
Keith Miller
kmiller@safebuilt.com
Denied
Reason:
Date Completed : 11/2/2023 5:11:12 PM
1) General: Provide the structural details for the support of the kitchen hoods. (2018 IBC section 107)

2) Sheet A102 (Floor Plan): Show the occupancies of the adjacent spaces to determine if fire separation is required per 2018 IBC Table 508.4.

3) Sheet P0.1 (Plumbing Details): Include the make, model, and details of the faucets showing compliance with amended 2018 IPC sections 412.11, 419.6.

4) Sheet P4.0(Plumbing Details): Include the T&P piping from the water heaters in Detail 2. (2018 IPC section 504.6)

5) Sheet E2.1 (Electrical Drawings): Show the rooftop HVAC service receptacle is GFCI protected. (2017 NEC sections 210.8, 210.63)



Mechanical(M) Reviewer
Keith Miller
kmiller@safebuilt.com
Denied
Reason:
Date Completed : 11/2/2023 5:12:17 PM
See the building review comments



Electrical(E) Reviewer
Keith Miller
kmiller@safebuilt.com
Denied
Reason:
Date Completed : 11/2/2023 5:11:53 PM
See the building review comments



Plumbing(P) Reviewer
Keith Miller
kmiller@safebuilt.com
Denied
Reason:
Date Completed : 11/2/2023 5:12:31 PM
See the building review comments.
11/22/2023 Water - PDSD REQUIRES RESUBMIT A 1-1/4” water meter is not an option from Tucson Water. The choice is for either a 1” water meter (maximum 50 GPM demand) or a 1-1/2” water meter (maximum 100 GPM demand).
11/20/2023 Fire New Construction REVIEW COMPLETED
10/31/2023 PDSD Application Completeness Express REVIEW COMPLETED