Permit Number: TC-COM-1023-02505
Parcel: 12714003C

Address:
355 N WILMOT RD

Review Status: Approved

Review Details: COMMERCIAL REVIEW - FULL v.3

Permit Number - TC-COM-1023-02505
Review Name: COMMERCIAL REVIEW - FULL v.3
Review Status: Approved
Review Date Reviewer's Name Type of Review Description Status Comments
02/12/2024 Site Zoning APPROVED
03/04/2024 Water - PDSD APPROVED
03/04/2024 Bldg Permits - Post Review REVIEW COMPLETED
01/30/2024 External Reviewers - SAFEBuilt REVIEW COMPLETED Structural(S) Reviewer
Madeline Nelson
mnelson@safebuilt.com
Approved
Reason:
Date Completed : 12/28/2023 2:44:18 PM




Building(B) Reviewer
Andrew Bevis
abevis@safebuilt.com
Approved
Reason:
Date Completed : 12/26/2023 8:51:47 PM



Mechanical(M) Reviewer
Jorge Valido
jvalido@safebuilt.com
Approved
Reason:
Date Completed : 1/2/2024 5:11:47 PM
1. Confirm Single Duct Terminal Unit type (minimum and maximum) for VAV 3.2.13. SINGLE DUCT TERMINAL UNIT SCHEDULE on Plan Sheet M405 states Constant Volume but gives Variable Volume Cooling Range - 150/500 CFM. - 2018 IBC - Section [A]107.2.1Information on construction documents.(RESOLVED)

2. Single Duct Terminal Unit 2.3.20 is identified as 2.2.20 - 2018 IBC - Section [A]107.2.1Information on construction documents.(RESOVED)

3. Confirm CFM quantity for TB2.4.21 - On Plan Sheet M140, TB2.4.21 has (2) 150 CFM SAD. SINGLE DUCT TERMINAL UNIT SCHEDULE on Plan Sheet M404 states Constant Volume 600 CFM - 2018 IBC - Section [A]107.2.1Information on construction documents.(RESOLVED)

4. Provide Commercial Kitchen Exhaust Hood plans. - 2018 IMC SECTION 507 COMMERCIAL KITCHEN HOODS 507.1 General. - 2018 IBC - Section [A]107.2.1Information on construction documents.(RESOLVED)

5. Provide Fire Suppression plans. 2018 IMC SECTION 507 COMMERCIAL KITCHEN HOODS 507.1 General. - 2018 IBC - Section [A]107.2.1Information on construction documents (RESOLVED)




Electrical(E) Reviewer
Ron Ross
rross@safebuilt.com
Approved with Comments
Reason:
Date Completed : 12/26/2023 12:51:12 PM
2nd Electrical Review of Hospital
By: Ron Ross PE
1. E320 SECOND FLOOR PLAN – POWER: Keynote 29 is incorrect or showing wrong location. EOR Response: We believe all Keynote 29 on this sheet are in the correct locations. Note 29 is pointing to a junction box for power to faucet power connection. Typical of five (5) locations this sheet. This is depicted similarly on other power sheets. Addressed

2. E510 FIRST FLOOR PLAN – FIRE ALARM & SECURITY: Missing Fire Alarm note 12. EOR Response: Fire alarm note 12 has been revised to fire alarm note 8 on revised Sheet E510. Addressed

3. E540 FOURTH FLOOR PLAN - FIRE ALARM & SECURITY: Could not locate Fire Alarm Note 15. EOR Response: Fire alarm note 15 is shown adjacent to shaft wall near nurse office 451. May be somewhat difficult to find due to room name text. Addressed

4. E801 ELECTRICAL ONE-LINE DIAGRAM:

a. TREQL1 primary CB is undersized for a typical 45 KVA transformer by using a 30A circuit breaker. Primary conductors not shown and will probably nuisance trip.
EOR Response: The CB for the 45KVA transformer TREQL1 is shown on E801 as a 70A/3P CB. This is shown correctly. The reviewer may be mistaking one of the breakers shown for the hot water pumps as being for this transformer. Breaker size is shown to the left of the breaker symbol by convention. The feeder for the transformer is shown on the panel schedule drawing on E908 and are not intended to be shown on E801. Addressed

b. Appears to be no panel/load connect to secondary of TRLSGEN. EOR Response: TRLSGEN is shown to supply an exterior disconnect for a portable generator shore power. Refer to E1008 note 27. This is shown correctly on E801. Addressed. Would suggest to add a CB or disconnect onto main feed of panel LSH1 to more quickly/easily isolate this panel if a portable generator is used so to not backfeed power into upstream circuits.

5. E904 ELECTRICAL SCHEDULES III:

a. PANEL NL3B – Section 2, Circuits 69/71 listed as 3 poles but only has 2 poles connected. EOR Response: The drawing has been corrected to show two-poles. Refer to revised Sheet E904. Addressed

b. PANEL NL3B – Section 2, Circuits 73/75 listed as 3 poles but only has 2 poles connected. EOR Response: The drawing has been corrected to show two-poles. Refer to revised Sheet E904. Addressed

6. E907 ELECTRICAL SCHEDULES VI: SWITCHBOARD EMSB, Circuit1 has a 1481A load on a 1200A breaker. EOR Response: This is only a NEC calculated demand load and not the actual demand load which is based on historical data from similar facilities. This is acceptable per NEC 517.31(D) and NEC 517.31(B)(1). In addition, this load is scheduled to be shed from EMSB if the generator becomes overloaded, as permitted by NEC 517.31(B)(2). Refer to emergency power system sequence of operation on E901. Addressed

7. E1001 ELECTRICAL ROOM DETAILS: Keynote 11s do not seem to be appropriate for their locations or should be reworded for clarity. EOR Response: We believe that the two keynote 11s shown in Detail 1/E1001 are shown in the correct locations. These are referenced to transformer TRLSGEN and the 100A/3P fused disconnect on the secondary side of TRLSGEN. This equipment is solely for use with a temporary portable generator. We believe note 11, taken in context with info on E801 and E1008 conveys the information needed for the constructing contractor. Addressed

8. E1003 ENLARGED MECHANICAL ROOM DETAIL: Missing Keynote 12. EOR Response: This drawing has been corrected. Refer to revised Sheet E1003 revising note 12 in two locations on plan to be note 9. Addressed



Plumbing(P) Reviewer
Perry Hendershott
phendershott@safebuilt.com
Approved with Comments
Reason:
Date Completed : 1/28/2024 9:26:43 PM
Third Plumbing Review: OK SUBJECT TO FIELD INSPECTIONS

Resolved-1). Add gutter & downspout sizes along with GPM loads to plan page A110- IPC 1106.3, 1106.6

Resolved-2). Add secondary roof drain detail to plan page A115 or P701-IPC 1101.7, 1108

Resolved-3). Add LP riser & system load info to plan page P804 -IFGC 402.3

Resolved-4). Plan page P100 illustrates the sand waste piping continuing to the floors above, plan page P801 does not. Plan pages need to correlate -IPC 106.3.1

Resolved-5). Floor sink drainage system for mechanical room on plan pages P100 & P801 isn't vented properly. The end system vent base isn't washed, the most upstream floor sink should be piped to drain past that vent base. -IPC 901.2.1,
915.2.3

6). Resolved-Add LP Tanks detail to plan pages P701 thru P703 -NFPA58, **LP VENDOR TANK INSTAKKION SUBJECT TO NFPA 58 & FIELD INSPECTIONS**
01/25/2024 PDSD Application Completeness REVIEW COMPLETED