Permit Review Detail
Review Status: Requires Resubmit
Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.2
Permit Number - TC-COM-1023-02495
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/12/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 06/12/2025 | Post-Installed Anchor Inspection (Deferred Submittal) Express | REQUIRES RESUBMIT | ACTIVITY NO. TC-COM-1023-02495 ADDRESS/PARCEL: (3760 N COMMERCE DR TUCSON, AZ 85705)) Submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. Review will not proceed without the response letter. COMMENTS: 1. Please submit the epoxy anchors field test report, or state in part C that the epoxy anchors were not utilized in this project. 2. Please resubmit only that special inspection certificate Contact Sean Severson with any questions: sean.severson@tucsonaz.gov |
||
| 06/12/2025 | Special Inspection Certificate Review (Deferred Submittal) Express | REQUIRES RESUBMIT | ACTIVITY NO. TC-COM-1023-02495 ADDRESS/PARCEL: (3760 N COMMERCE DR TUCSON, AZ 85705)) Submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. Review will not proceed without the response letter. COMMENTS: 1. Please submit the epoxy anchors field test report, or state in part C that the epoxy anchors were not utilized in this project. 2. Please resubmit only that special inspection certificate Contact Sean Severson with any questions: sean.severson@tucsonaz.gov |
||
| 06/12/2025 | Concrete Installation Inspection (Deferred Submittal) Express | REVIEW COMPLETED | RETAINING WALLS | ||
| 06/12/2025 | Concrete Installation Inspection (Deferred Submittal) Express | REVIEW COMPLETED | SAMPLING AND TESTING | ||
| 06/12/2025 | Other Inspection Reports (Deferred Submittal) Express | REVIEW COMPLETED | REINFORCING STEEL | ||
| 06/10/2025 | PDSD Application Completeness Express | REVIEW COMPLETED | |||
| 06/12/2025 | Site Prep Inspection (Deferred Submittal) Express | REVIEW COMPLETED |