Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.4
Permit Number - TC-COM-1023-02490
Review Name: COMMERCIAL REVIEW - FULL v.4
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/02/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 04/02/2024 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Madeline Nelson mnelson@safebuilt.com Approved Reason: Date Completed : 1/11/2024 8:48:36 PM Building(B) Reviewer Keith Miller kmiller@safebuilt.com Approved Reason: Date Completed : 3/26/2024 12:01:26 PM The building review is approved. Subject to the field inspector's approval Mechanical(M) Reviewer Jorge Valido jvalido@safebuilt.com Approved Reason: Date Completed : 1/10/2024 9:39:12 AM 1. Identify Ventilation Schedule as: O/A Ventilation Schedule as per 2018 IMC Table 403.3.1.1 - 2018 IBC Section [A]107.2.1 Information on construction documents.(RESOLVED) 2. On Ventilation Schedule identify the required O/A per specific area and the provided O/A per specific RTU - 2018 IBC Section [A]107.2.1Information on construction documents.(RESOLVED) 3. Provide on Mechanical Plans a diagram with RTU and Curb tie down specifications - 2018 IMC Sections Section 301.15 Wind resistance and 301.18 Seismic resistance. 2018 IBC Section [A]107.2.1Information on construction documents.(RESOLVED) Electrical(E) Reviewer Ron Ross rross@safebuilt.com Approved Reason: Date Completed : 11/7/2023 5:40:01 PM Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Denied Reason: Date Completed : 3/28/2024 11:03:16 PM Fourth Plumbing Review: Resolved-1). Need to Address Building plan review comments 1 & 4 -IPC 403.1 Resolved-2). add gas system sizing table used to plan page PO1.1 -IFGC 402.3 Resolved-3). Plan page C3.1 not clear where 2" main connects to splash pad - _IPC 106.3.1 RESOLVED-4), Plumbing Plan page P1.1 shows rest room in the previous craft room area , plan pages A1.0 & G2.0 show open room with break sink. Update all affected pages .l -2018 IPC 106.3.1 5). PLAN PAGE P2.1: The rest room that was removed from plan page P1.1 craft room is still shown on water & sanitary riser diagrams. Also the now shown craft room sink is not clear if new or existing? Remove the craft room rest room piping from page P2.1 riser diagrams & make clear if the craft sink is new or existing on all plumbing pages. -2018 IPC 106.3.1 |
||
| 03/25/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |