Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1023-02490
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/21/2023 | Site Landscape | APPROVED | |||
| 11/22/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 11/13/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Madeline Nelson mnelson@safebuilt.com Denied Reason: Date Completed : 11/8/2023 10:38:31 PM 1. STRUCTURAL CALCULATIONS: The structural calculations for the fabric shade structure are stamped with a seal that has expired (March 31, 2023). Please resubmit this portion of the calculations with a valid seal by a professional engineer licensed in the state of Arizona. Note that since the original signing, the PE Paul Nzomo has had his license status changed from "Active" to "Restricted". Please comply with all Arizona State Statutes when reissuing documents. 2. STRUCTURAL CALCULATIONS: Please confirm the Wind Exposure category that applies to this project. Structural Calculations, page 12 of 50 states that design was carried out using a Category B exposure. However, the Structural General Notes, Sheet S1.0 indicates Exposure Category C. Please revise documents to eliminate this conflict. Building(B) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 11/1/2023 3:37:58 PM 1) General: Provide the splash pool structure, deck, equipment, and details on all applicable sheets. (2018 IBC section 107) 2) General: Provide the membrane structure construction drawings, details, and footings. (2018 IBC section 107) 3) Sheet g2.0 (Building Data): Based on the information shown on the plans, this building and outside play areas are assembly spaces. Please clarify the occupancy classification "E" shown. (2018 IBC Chapter 3) 4) Sheet g2.0 (Building Data): Include the total occupant load and minimum plumbing fixture calculations for the spaces and toilet rooms serving the building and play areas. The break room is an assembly use area and is not to be calculated as 1 person per 100 sf - use 1/7sf or 1/15sf. Please revise all affected sheets. (2018 IBC section 1004, Table 1004.5) 5) Sheet g2.0 (Building Data): Include the building height. (2018 IBC sections 107, 504) 6) Sheet L2.1: Show the dimensions of the splash pool, deck, and membrane structures. (2018 IBC section 107) 7) Sheet a7.0: Show the dimensions of the accessible clear floor spaces. (2009 ICC A117.1 section 604.3) 8) Sheet a7.0: Detail 7/a7.0 shows the toilet center line distance to the wall exceeds to maximum allowed distance. (2009 ICC A117.1 section 604.2) Mechanical(M) Reviewer Jorge Valido jvalido@safebuilt.com Denied Reason: Date Completed : 10/31/2023 1:08:55 PM Identify Ventilation Schedule as: O/A Ventilation Schedule as per 2018 IMC Table 403.3.1.1 - 2018 IBC Section [A]107.2.1 Information on construction documents. On Ventilation Schedule identify the required O/A per specific area and the provided O/A per specific RTU - 2018 IBC Section [A]107.2.1Information on construction documents. Provide on Mechanical Plans a diagram with RTU and Curb tie down specifications - 2018 IMC Sections Section 301.15 Wind resistance and 301.18 Seismic resistance. 2018 IBC Section [A]107.2.1Information on construction documents. Electrical(E) Reviewer Ron Ross rross@safebuilt.com Approved Reason: Date Completed : 11/7/2023 5:40:01 PM Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Denied Reason: Date Completed : 11/9/2023 10:53:16 PM First Plumbing Review 1). Need to Address Building plan review comments 1,4,8 -IPC 403.1 2). add gas system sizing table used to plan page PO1.1 -IFGC 402.3 3). Plan page C3.1 not clear where 2" main connects to splash pad - _IPC 106.3.1 |
||
| 11/13/2023 | Fire New Construction | REQUIRES RESUBMIT | -Indicate in code analysis if building has a fire alarm complying with 907.2.3 or 1103.7.1. If it does not, explain how it meets the exceptions. john.vincent@tucsonaz.gov 5203495581 |
||
| 11/22/2023 | Site Engineering | REQUIRES RESUBMIT | See zoning comment | ||
| 11/07/2023 | Site Zoning | REQUIRES RESUBMIT | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: TC-COM-1023-02490 218 E. Prince Rd. – C-2/R-3 (1st Review) TRANSMITTAL: November 7, 2023 Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This site is located in the C-2/R-3 zone. 1. Until development package (DP) TD-DEV-1023-00427 is accepted for review and the 1st review is completed Zoning cannot review the building plans. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
||
| 11/16/2023 | Water - PDSD | REQUIRES RESUBMIT | Provide the size of the water meter serving the water distribution system in the existing building, the size of the backflow preventer associated with the water meter, and the total water demand served by the water meter. Reference: Section 107.2.1, IBC 2018. | ||
| 10/26/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |