Permit Number: TC-COM-1023-02490
Parcel: 10604071B

Address:
218 E PRINCE RD

Review Status: Approved

Review Details: COMMERCIAL REVIEW - FULL v.6

Permit Number - TC-COM-1023-02490
Review Name: COMMERCIAL REVIEW - FULL v.6
Review Status: Approved
Review Date Reviewer's Name Type of Review Description Status Comments
04/09/2024 Bldg Permits - Post Review Express REVIEW COMPLETED
04/09/2024 External Reviewers - SAFEBuilt REVIEW COMPLETED Structural(S) Reviewer
Madeline Nelson
mnelson@safebuilt.com
Approved
Reason:
Date Completed : 1/11/2024 8:48:36 PM



Building(B) Reviewer
Keith Miller
kmiller@safebuilt.com
Approved
Reason:
Date Completed : 3/26/2024 12:01:26 PM
The building review is approved. Subject to the field inspector's approval.



Mechanical(M) Reviewer
Jorge Valido
jvalido@safebuilt.com
Approved
Reason:
Date Completed : 1/10/2024 9:39:12 AM
1. Identify Ventilation Schedule as: O/A Ventilation Schedule as per 2018 IMC Table 403.3.1.1 - 2018 IBC Section [A]107.2.1 Information on construction documents.(RESOLVED)
2. On Ventilation Schedule identify the required O/A per specific area and the provided O/A per specific RTU - 2018 IBC Section [A]107.2.1Information on construction documents.(RESOLVED)
3. Provide on Mechanical Plans a diagram with RTU and Curb tie down specifications - 2018 IMC Sections Section 301.15 Wind resistance and 301.18 Seismic resistance. 2018 IBC Section [A]107.2.1Information on construction
documents.(RESOLVED)




Electrical(E) Reviewer
Ron Ross
rross@safebuilt.com
Approved
Reason:
Date Completed : 11/7/2023 5:40:01 PM



Plumbing(P) Reviewer
Perry Hendershott
phendershott@safebuilt.com
Approved
Reason:
Date Completed : 4/8/2024 11:48:59 PM
Fifth Plumbing Review: OK
Resolved-1). Need to Address Building plan review comments 1 & 4 -IPC 403.1
Resolved-2). add gas system sizing table used to plan page PO1.1 -IFGC 402.3
Resolved-3). Plan page C3.1 not clear where 2" main connects to splash pad - _IPC 106.3.1 RESOLVED-4), Plumbing Plan page P1.1 shows rest room in the previous craft room area , plan pages A1.0 & G2.0 show
open room with break sink. Update all affected pages .l -2018 IPC 106.3.1
Resolved-5). PLAN PAGE P2.1: The rest room that was removed from plan page P1.1 craft room is still shown on water & sanitary riser diagrams. Also the now shown craft room sink is not clear if new or existing? Remove the craft room rest room piping from page P2.1 riser diagrams & make clear if the craft sink is new or existing on all plumbing pages. -2018 IPC 106.3.1
04/08/2024 PDSD Application Completeness Express REVIEW COMPLETED