Permit Number: TC-COM-1023-02489
Parcel: 10408078C

Review Status: Requires Resubmit

Review Details: COMMERCIAL PDSD SIMPLE REVIEW v.1

Permit Number - TC-COM-1023-02489
Review Name: COMMERCIAL PDSD SIMPLE REVIEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
10/23/2023 Bldg Permits - Post Review PENDING ASSIGNMENT
10/23/2023 Commercial Electrical REQUIRES RESUBMIT Please address the electrical plan review comments and provide a written response.

Ref; Electrical Line diagram.

1. Provide documentation from the manufacturer of this service equipment (include contact person) stating in writing and signed on an official company letterhead, by the qualified person employed with the manufacturer, that performing a bus tap in the existing service equipment at the location shown in the electrical line diagram will not compromise the performance or listing of the equipment. Include manufacturers specifications and cut sheets of all hardware, termination lugs utilized to perform the bus tap.

2. The option to providing documentation containing written approval from the manufacture, would be to provide for a qualified NRTL agency to perform a field evaluation and approval of the equipment modifications after the modifications are performed, in order to re-certify and maintain the listing of this equipment. NEC Art 110.3.

3. Provide a complete panel schedule for the existing panel ‘DP-1’. The columns for ‘Phase A’, ‘Phase B’, and ‘Phase C’ for the ratings of existing electrical equipment loads are blank and the total loads are unbalanced between phases by more than 10%. Please revise and re-submit.

4. Please provide EV Charging Station manufacturers cut sheets with specifications.

Ref; 2018 IBC section 107.2.1, 2017 NEC
10/20/2023 PDSD Application Completeness REVIEW COMPLETED